According to this poster, CAC puts a tarp on production aircraft only after they have completed test flights. He also claims that there are way more than 7 J-20s than shown.
Test flights can be conducted only after engines have been installed and all systems are a go.
This contrasts with an earlier post saying that WS-10B faced some troubles and has been resolved.
So ultimately, what they meant is ?