SinoSoldier
Colonel
Do you think that SAC will do 6 years of testing and not redesign a naval varient to pitch to PLAN considering they already have a naval aircraft in operation ?
They will certainly pitch a naval version, after first land based prototype many thought the project was dead then we seen the 2nd much improved prototype
What is alternative, J20? Too big, not naval optimised and not practical
Carrier 002/003 will need a air wing, the timing for that is about now
That is valid as an opinion, but do you have supporting evidence (or even circulated rumors) that the third prototype will appear in 2018? I don't think SAC would pre-emptively develop and build a naval variant using its own pocket money without at least some form of PLAN backing to it.