It looks like Shenyang is looking to partially relocate its facilities to a new industrial zone. Below are two bidding documents. The first document announces the winning bid for an "analysis and evaluation of social stability risks associated with a partial re-location of Shenyang Aircraft Company". The second document is a request for bid for temporary electrical installations (i.e. transformers, substations, etc.) at Shenyang's new factory facility, which the document calls Shenbei new factory zone (沈北新厂区), indicating that it's located in north Shenyang or north of Shenyang.

52884702618_1cecd3bcd2_k.jpg
52883680357_3a244a8955_k.jpg

Some procurement documents from Sheyang Aircraft Corporation for a new "comprehensive assembly plant" located in the Shenbei New Industrial Zone (沈北新厂区). The assembly building has an area of 280,450 square meters. The project will take two years, with construction set to begin around June 20, 2023 and end around June 30, 2025.

52965877330_fc50bf3f59_h.jpg
52965958038_87af4499a6_h.jpg
 

Deino

Lieutenant General
Staff member
Super Moderator
Registered Member
Some procurement documents from Sheyang Aircraft Corporation for a new "comprehensive assembly plant" located in the Shenbei New Industrial Zone (沈北新厂区). The assembly building has an area of 280,450 square meters. The project will take two years, with construction set to begin around June 20, 2023 and end around June 30, 2025.

52965877330_fc50bf3f59_h.jpg
52965958038_87af4499a6_h.jpg


That‘s the same as posted in the J-35-thread I assumre?

By the way, I already wanted to ask, if we have information, where this new hall will be built at SAC? And I must admit - but as such fitting to your explanation - there was already a new manufacturing hall built in recent years, which I thought was built for J-35 production.

So is this close to their regular facility?
 
Last edited:

by78

General
That‘s the same as posted in the J-35-thread I assumre?

By the way, I already wanted to ask, if we have information, where this new hall will be built at SAC? And I must admit - but as such fitting to your explanation - there was already a new manufacturing hall built in recent years, which I thought was built for J-35 production.

So is this close to their regular facility?

Yes, this is the same as posted in the J-35 thread. This is an entirely new facility located in a new industrial zone. Judging by its name –– Shenyang North New Industrial Zone (沈北新厂区) –– it's likely located north of existing facilities. I do spot some empty plots north of SAC's existing runway, so it might be located somewhere there.
 

Deino

Lieutenant General
Staff member
Super Moderator
Registered Member
Yes, this is the same as posted in the J-35 thread. This is an entirely new facility located in a new industrial zone. Judging by its name –– Shenyang North New Industrial Zone (沈北新厂区) –– it's likely located north of existing facilities. I do spot some empty plots north of SAC's existing runway, so it might be located somewhere there.


As it seems, a good friend of mine was able to locate that area!

 

Kalec

Junior Member
Registered Member
Since everyone is focusing on proposed Shenyang AVIC.

Chengdu may have entered final phase of its 3rd round of expansion.

Sadly GE is not doing its job and even Baidu map updated satellite image south of existing assembly plant.