not sure where to put this, but this is posted somewhere, I guess rumour time
1,歼轰七A将在今明两年完成空军和海航各两个团的装备工作,歼轰七A换发大改后,载弹量将从现在的9吨级升至10吨级,同时大改还包括空中加油设备,电子对抗设备等等,另外,歼轰七A的机载武器系统,包括YJ88(KD88),YJ85,新YJ,新一代激光制导炸弹,北斗卫星制导炸弹,联合防区外弹药(散布器),空射远程巡航导弹等等将在十一五计划内完成。
JH-7A will finish preparing 2 regiment in plaaf and 2 in planaf in the next 2 years. After JH-7A is modified, it's payload will increase from 9 to 10 tonnes, it also includes IFR, ECM. JH-7A's weapon system includes KD-88 (land attack version of YJ-83?), YJ-85 (air launched YJ-83), new YJ, new generation LGB, Beidou guided munitions, air launched long distance LACM will finish in the 11th 5 year plan (basically 2006-2010)
2,歼十一B年内或明年年初定型,歼十一B双座型号进展顺利,为歼十一其他研制项目奠定了良好的技术基础。
J-11B will be certified in the end of this year or beginning of next. Twin seated J-11B advancing smoothly, providing good platform for other J-11 programs.
3,歼十A机的产量稳定,至明年年底,总保有数可达到200~205架。
J-10A production is steady, by end of next year, will have around 200 to 205 of them.
4,目前,新型歼击机的研制工作已经提速,歼十机大改工作正在加紧。
new Jian development is speeding up and so is modified J-10.
5,海军舰载机工程启动后,引进苏33型机将有利于该工程取得阶段性成果。
After naval fighter program started, improved su-33 like aircraft will receive the fruit of this?
6,海军舰载预警机工程进展顺利,机载新型雷达在研。
naval AEW programming advancing smoothly, new radar is under development
7,高新工程将在明年完成两机首飞,一机鉴定,一机预研。
High new series will fly two aircraft by end of new year, one certified, one in development (Y-8F600 and Y-9?)
8,空警2000和空警200将在明年大批量装备部队,空警2000和空警200改进工作将与装备工作同步进行。
KJ-2000 and KJ-200 will mass enter service next year, Both are going through serious improvement work.
9,新一代空空导弹,即10号弹,13号弹,14号弹进展顺利。
new AAM, (basically PL-10, PL-13 and PL-14) advancing smoothly
10,四种无人机工程相继进入不同节点,中程多用途无人机可望明年亮相,远程高空无人机进度加快,无人战斗机预研项目进展顺利。
4 types of UAV in different stages, medium range multirole UAV will appear next year, long range high altitude UAV progressing very fast and combat UAV is also advancing smoothly.