Indian Military News, Reports, Data, etc.

aahyan

Senior Member
Registered Member

Indian Navy On its Way to a Million Tonne – 50 Ships Under Construction​


With 50 of the 66 contracted vessels already under construction, the Indian Navy is about to launch a massive expansion plan. There are fifty warships being built, ranging from block fabrication to ships prepared for sea trials.

Six shipyards in India are building 48 of these, while Yantar in Kaliningrad, Russia, is building the remaining two. These projects include ships valued at over 1.1 lakh crore INR ($13 billion), with a combined tonnage of over 200,000 tons. The following twelve months will see the delivery of twelve of these vessels.

There are twelve total: five frigates, one destroyer, two corvettes, one submarine, and three survey vessels.

1725361694654.png

Please, Log in or Register to view URLs content!
 

johncliu88

Junior Member
Registered Member

Indian Navy On its Way to a Million Tonne – 50 Ships Under Construction​


With 50 of the 66 contracted vessels already under construction, the Indian Navy is about to launch a massive expansion plan. There are fifty warships being built, ranging from block fabrication to ships prepared for sea trials.

Six shipyards in India are building 48 of these, while Yantar in Kaliningrad, Russia, is building the remaining two. These projects include ships valued at over 1.1 lakh crore INR ($13 billion), with a combined tonnage of over 200,000 tons. The following twelve months will see the delivery of twelve of these vessels.

There are twelve total: five frigates, one destroyer, two corvettes, one submarine, and three survey vessels.

View attachment 135139

Please, Log in or Register to view URLs content!
The shipyard workers will have their jobs secured for 15 to 20 years, thumbs up.
 

gelgoog

Lieutenant General
Registered Member
With three production lines ready in India, let's see if GE delivers on its commitment to produce two engines per month starting in September and ramping up to 24 fighters annually.
A lot of people waiting for these engines. Not just for the Indian Tejas, but also the Swedish Gripen E, and the South Korean KF-21.
Once the Boeing T-7A Red Hawk starts production it will also need these engines.
 
Top