Jingce Electronics: Subsidiary semiconductor equipment and excimer laser projects are in the research and development stage
Jingce Electronics stated on the investor interaction platform that the semiconductor equipment and
excimer laser project of the company's subsidiary Beijing Jingce Semiconductor Equipment Co., Ltd. are currently in the research and development stage. And excimer laser project construction progress is advancing as planned.
According to reports, Shanghai Jingce is currently focusing on the field of semiconductor front-end testing equipment, and is committed to the research, development and production of semiconductor front-end measurement and testing equipment. Shanghai Jingce film thickness products (including independent film thickness equipment) and electron beam measurement equipment have obtained batch orders from domestic first-line customers; bright field optical defect detection equipment has obtained breakthrough orders; OCD equipment has been verified by many first-line customers Passed, and some orders have been obtained; semiconductor silicon wafer stress measurement equipment has also obtained customer orders, and the remaining reserved products are currently in the process of research and development, certification and expansion.
In the Micro-OLED field, from the wafer section to the module section, Jingce Electronics can provide related products such as full-process inspection, repair equipment, and key optical instruments and meters, including wafer appearance defect inspection and critical dimension measurement equipment, ATE and Signal-driven detection equipment, display defect detection and optical evaluation system, Gamma Tuning display adjustment and Mura repair equipment and integrated solutions integrating the above functions; applied to Micro-OLED detection and display adjustment key optical instruments and meters, including color analysis instrument, imaging flicker frequency measuring instrument, imaging luminance and colorimeter, high-precision area array spectrometer, AR/VR measuring instrument, Micro-OLED micro-display multifunctional brightness and chromaticity measuring instrument and other core components and precision pressure Fixtures, etc.
Because the verification period of semiconductor testing equipment is affected by various factors such as equipment type, customer requirements, and on-site environment, the current industry verification period is generally about 6-18 months; the current delivery period of equipment is generally more than 6 months. The manufacturer's delivery cycle is generally as long as 12 months or more.