@Mountain Yes bro that is a good question? Let me try ,SMIC in 2022 by 2023 Huawei with SMIC JV FAB in Shenzhen.Big question is who will fab them???? Has Huewei has a magic solution???? Let's hope n wish for the best.
@Mountain Yes bro that is a good question? Let me try ,SMIC in 2022 by 2023 Huawei with SMIC JV FAB in Shenzhen.Big question is who will fab them???? Has Huewei has a magic solution???? Let's hope n wish for the best.
Interesting video regarding Chinese semiconductor equipment
But a key component supplier, that of the light source for EUV, Cymer, is an American company. Besides that, the United States has already demonstrated its ability to prevent its allies from allowing their companies to do business with China in ways that the United States does not want it to. It will continue to do so indefinitely. The United States only relents when it becomes clear that China does possess import substitution capabilities that can ensure it can replace - if it wants to - imports that the United States does not want China to have, with domestic alternatives of very comparable and even better quality.That sad part is that pundits in the United States wants to ASML that is not even a U.S. company to face the economic brunt of sanctions to China while U.S. companies AM, KLA, LAM can keep reaping billions from China because "their equipment is not that important" or "China already produce those" or "They will buy it from elsewhere". Imagine how the Europeans feel.
What is SSMB? I know that LPP is laser produced plasma and DPP is discharged produced plasma.They will still go ahead with the LPP/DPP.
In China they always make sure that there are several options to ensure success.
But it appears that Tsinghua Uni is quite confident in building this SSMB Light Source and getting it to work.
There are also no patent issues with this new technology.
The Power can also easily be scaled up and in the long term it has more potential.
The amount of energy needed for semiconductors is an even smaller % of the total energy demand.The amount of energy used on mining crypto-currencies is very small % of the total energy demand.
In this video SMIC CEO Zhao HaiJun said something important. He says that recently he met someone who is building a new fab,they plan to purchase a large percent of domestic equipment. They told Zhao that any domestic equipment that is already proven on SMIC production line they will just buy without question,equipment that have not proven yet will request manufacture to send one to test on.
Zhao stress that if a new fab plan to buy many domestic equipments,it is important to contact the equipment manufacture 3 years prior to the fab construction work done. Because most of domestic equipments are new products unlike those mature tools from MNCs,fabs and tool manufactures need to work together to test and iterate these new tools for years,so these tools will be matured enough by the time fab construction is complete. If a fab only starts to buy tools in the last minutes,they won't have the luxury to test new domestic tools,and will likely buy proven tools from MNCs in
Light source from accelerated electrons. Proposed device is similar toWhat is SS
What is SSMB? I know that LPP is laser produced plasma and DPP is discharged produced plasma.
But a key component supplier, that of the light source for EUV, Cymer, is an American company.