Just found two screenshots posted on Chinese internet dated back to the first silo found in Yumen. The origin ones are posted in 11/2017.
The first one mentioned construction project in Yumen which is contracted for mainly ¥180/m^3 or ¥380/m^3 on specifically "digging [something] 110m deep, 8m wide."
The second one mentioned the average contract price per m^3 is ¥190 and the total project will be 500 MILLION m^3.
For comparison, Minuteman silo project excavated 20 million yard^3 (roughly 15.29 million m^3) for 150 launch facilities and 15 launch centers.
My question is how real this screenshot is and if it is a scam. And if it is a fraud, why Yumen. Because Yumen is in middle of nowhere and basically reserved for PLA, rocket launch and oil field. If someone planned to scam whole lot of money from construction companies, there was no mention about deposit for this project at all.
Another question is whether it was only accounted for silo project in Yumen if it is real. Someone on Chinese internet suggested the number might not be accurate or could be for the entire silo-based missile project. I have found no reasonable answer and definitely won't be surprised if new silos are found in the future.
If it is not fake, it is really telling and connecting every dots in this nuclear change.
- In this timeline, China - US relation deteriorated after Trump got elected in 2016.
- After Trump formally inaugurated in January 2017, he ordered to change the nuclear posture review.
- Since then China decided to rapidly expand nuclear force by ten fold, restart plutonium and warheads production.
- Silo excavation started bidding in late 2017 and began construction in probably 2018/2019.
- US declared trade war on China in January 2018.
- The new NPR published in February 2018 explicitly said the new administration will "expand U.S. nuclear options now, to include low-yield options," de-facto nuclear coercion in the case of Taiwan.
- A 2.65m diameter solid fueled engine successfully conducted its first hot testing in March 2019.
- Silo bases in Yumen and Hami are found by satellite in their late construction stage in June 2021.
- Another one found in Ordos, and probably more to be found in somewhere else.
Edit: The projection was scheduled to be completed in 5 years according to the second screenshot, not sure how real it is tho.
The first one mentioned construction project in Yumen which is contracted for mainly ¥180/m^3 or ¥380/m^3 on specifically "digging [something] 110m deep, 8m wide."
The second one mentioned the average contract price per m^3 is ¥190 and the total project will be 500 MILLION m^3.
For comparison, Minuteman silo project excavated 20 million yard^3 (roughly 15.29 million m^3) for 150 launch facilities and 15 launch centers.
My question is how real this screenshot is and if it is a scam. And if it is a fraud, why Yumen. Because Yumen is in middle of nowhere and basically reserved for PLA, rocket launch and oil field. If someone planned to scam whole lot of money from construction companies, there was no mention about deposit for this project at all.
Another question is whether it was only accounted for silo project in Yumen if it is real. Someone on Chinese internet suggested the number might not be accurate or could be for the entire silo-based missile project. I have found no reasonable answer and definitely won't be surprised if new silos are found in the future.
If it is not fake, it is really telling and connecting every dots in this nuclear change.
- In this timeline, China - US relation deteriorated after Trump got elected in 2016.
- After Trump formally inaugurated in January 2017, he ordered to change the nuclear posture review.
- Since then China decided to rapidly expand nuclear force by ten fold, restart plutonium and warheads production.
- Silo excavation started bidding in late 2017 and began construction in probably 2018/2019.
- US declared trade war on China in January 2018.
- The new NPR published in February 2018 explicitly said the new administration will "expand U.S. nuclear options now, to include low-yield options," de-facto nuclear coercion in the case of Taiwan.
- A 2.65m diameter solid fueled engine successfully conducted its first hot testing in March 2019.
- Silo bases in Yumen and Hami are found by satellite in their late construction stage in June 2021.
- Another one found in Ordos, and probably more to be found in somewhere else.
Edit: The projection was scheduled to be completed in 5 years according to the second screenshot, not sure how real it is tho.