The same mod fzgfzy who posted about 001A from CJDBY talk about 055 today in his post today. Believe if you will, just pass the information along.
1. Work on 055 started March-2015. Modules preparation estimated around 12-15 months.
3. Tonnage is not as big as estimated earlier. Displacement: 11,000+ tons. Fully loaded: 12,000+ tons.
4. Propulsion: 4X XX engines. ( someone ask if XX means QC-280 gas turbine engines, he said: No comment)
And 18-19 052D will be build, Don't ask why odd numbers, he also doesn't know. It will then switch to 052E, plus some of the new techs from 055 will be used on 052E.
If this info is true then:
I think that this means that the picture of the december 2014 construction was fake.
Info about tonnage is now more adequate with the photos from the mockup. I always suspected that that ship didnt have size to have 13-14k ton max. 12+k ton weight is about the size of slava-class.
Im curious about what kind of propulsion it will use. Combination of gas-turbine/diesel engine like the type 052d? (in this case more powerful versions of QC-280 i assume) or something else?
Is this the first time people here saw reference of "type 052E" ? For me it is. I thought that china would get a new design for the future, instead of another iteneration of the 052 platform.