The target detection range with such an EPR, at a target flight altitude: 500 meters - 53 km, at an altitude of 10,000 meters - 230 km and at an altitude of 27,000 meters - 320 km. Limits of work: in range - 400 km. It should be noted that the radar data is underestimated. Station deployment time - 15 min.
8 inch surplus shells attached to a weak rocket booster. Cousin of Nebelwerfer. Smart use of obsolete resources.Modernized MLRS "Cheburashka" appeared in Donetsk. MLRS "Cheburashka" was developed by Donetsk specialists in 2018. The MLRS uses non-standard caliber 217 mm ammunition, which does not match the Soviet and any other rocket systems. The ammunition itself is also produced in Donetsk. In addition to a large number of missiles, the feature of the Cheburashka MLRS is the ability to hit two targets simultaneously. Two swivel rail packs for 64 missiles are mounted on a KrAZ all-wheel drive chassis. Packages are guided and controlled from a remote control - similar to the Grad MLRS. The officially declared firing range is 10 kilometers. According to the developers, only locally produced parts are used to create the MLRS.
JSC "Uraltransmash" (as part of the concern "Uralvagonzavod" (part of the state corporation "Rostec") ahead of schedule supplied the Ministry of Defense of the Russian Federation with a batch of self-propelled artillery installations "Msta-S", which underwent major repairs and modernization, the UVZ press service reported.
The modernized self-propelled guns were equipped with an automated guidance and fire control system, and they also carried out a major overhaul of all units, said Dmitry Semizorov, general director of Uraltransmash.
The third frigate of project 22350 "Admiral Golovko" in the dock and after launching.
The ship should be handed over before the end of this year, but something tells us that it will not raise the flag until 2023.
- Such frigates were supposed to go, including to the Black Sea Fleet.
- They have a powerful air defense system "Polyment-Redut".
- It is very lacking in the Black Sea.
And you also ask why finance shipbuilding and (oh my God!) Timely delivery of orders.
***
All three had to be on the Black Sea until the age of 14. Now Moscow would be intact and the crests would be raked out. As a result, an export version of the outdated Soviet TFR (project 11356R) was driven to the KChF