Seawolf class were said to be designed to engage 5 underwater targets at once with torpedoes. The idea was to make effective ASW defence of the soviet arctic SSBN bastion impossibly expensive by making even a single penetration of the bastion by a Seawolf unbearably dangerous and costly.
 

Quickie

Colonel
Re: PLAN submarines Thread II

As the sub move forward, it has to reel in the wire, otherwise the wire would trail behind, scrape the hull and possibly foul the screw. If the wired becomes crossed and tangled, it might jam as it is reeled in.

It would reel in the slacking wires that are a short distance in front but would the submarine reel in the 10s of km of wires that are extended all the way through or it would reel in just the portion of the wires that are slacking until the torpedoes are released and cut off the rest of the wires.?
 

chuck731

Banned Idiot
Re: PLAN submarines Thread II

It would reel in the slacking wires that are a short distance in front but would the submarine reel in the 10s of km of wires that are extended all the way through or it would reel in just the portion of the wires that are slacking until the torpedoes are released and cut off the rest of the wires.?

It would probably cut off the wire once the torpedo is expended.

However, if the two targets are in significantly different directions, then the wires for torpedos engaging them would likely cross very close to the submarines if they cross at all, unless the torpedoes are purposely steered in a roundabout course to avoid the wires tangling or crossing close to the submarine.
 

Quickie

Colonel
Re: PLAN submarines Thread II

It would probably cut off the wire once the torpedo is expended.

However, if the two targets are in significantly different directions, then the wires for torpedos engaging them would likely cross very close to the submarines if they cross at all, unless the torpedoes are purposely steered in a roundabout course to avoid the wires tangling or crossing close to the submarine.


What I'm thinking is that, the wires can be programmed to be allowed to cross only when they are kms away from the submarine. This way the torpedoes have more flexibility in the way they maneouvre without having to be limited by the constraint that the torpedoes' path can't be crossed and that they have to suddenly change directions because of this constraint and losing the target for good.
 

A.Man

Major
Re: PLAN submarines Thread II

Declassified PLAN first nuclear submarine unit

[video]http://dp.sina.cn/dpool/video/pad/play.php?url=http://video.sina.com.cn/p/news/c/v/2013-10-27/193163071785.html[/video]
 

chuck731

Banned Idiot
Re: PLAN submarines Thread II

a little bit on the AIP engine installed on Yuan

basically said that they got a prototype as early as 1998 and the AIP engines come in the form of 20 and 100 kw. Of note, the stirling engines used on Gotland generate 75 kw each. So, 2 100 kw AIP engine on the larger Yuan would make sense.

That implies the AIP engine is good for low speed creeping only. 75KW is not even 100 horse powers. 2 100 KW AIP engines is only 260 horsepowers, less than available in most sports sedans. These are a tiny fraction of typical diesel or electric motor on a typical diesel electric sub.
 

Blitzo

Lieutenant General
Staff member
Super Moderator
Registered Member
Re: PLAN submarines Thread II

That's the case with all AIP equipped submarines. Modern SSKs don't emphasize speed but rather stealth, while modern SSNs should emphasize both, along with endurance.
An SSK equipped with AIP allows for stealth and endurance, but naturally low speed compared to an SSN. In a defensive position, low speed shouldn't be as much of an issue.
 

A.Man

Major
Re: PLAN submarines Thread II

More Information Were Declassified by this CCTV program:

In past 42 years, no nuclear accident;
World records: 90 days submerged mission, deepest dive;
Successful decommissioned old nuclear submarines;
Nuclear submarines will join carrier battle gruop.

[video=youtube;Z-Nd5kYCGu4]http://www.youtube.com/watch?v=Z-Nd5kYCGu4[/video]

The Develop History of China Nuclear Submarine:

1968年11月23日,091首艇在431厂开工建造。 1969年11月6日,上船台。 1970年4月4日,试水。
1969年7月,组建第一支核潜艇艇员队(十一艇员队)36人,艇长杨玺,政委 崔桂江。
1970年4月底,核潜艇陆上模式堆提前完工,质量优良。
1970年5月1日,核潜艇陆上模式堆开始试车。
1970年7月17日凌晨2时,核潜艇陆上模拟堆开始提升功率,7月30日,试验达 到满功率,宣告陆上模拟堆正式建成。
1970年10月,核潜艇基地部队组建。

1970年12月26日,401艇下水。
1971年4月1日-8月16日,401艇完成系泊试验。 4月30日,完成艇上反应堆安装。 6月,401艇第一次全艇联合试验开始进行,随后进行核潜艇水下启堆试验。 7月1日,401艇首次以核能发电,进行了主机试车和动力装置联试的初步考核。

1971年8月23日-1972年4月23日,401艇进行第一阶段航行试验。
1972年8月20日-10月31日,401艇进行了扩大航行试验。
1972年11月-1973年12月,401艇坞修。
1974年1-4月,401艇进行了第三阶段检验性航行试验。在先后三个阶段的试验中401艇共出海试验26次,试验项目174个,反应堆共运行2705小时,累计航程6072海里。 1974年8月1日,401艇入役,定名为“长征一号”。首任艇长杨玺。

1975年2月,第一支核潜艇支队在北海舰队组建。

1975年8月3日,401艇设计、生产定型。

1980年12月30日,402艇入役。(1970年7月25日开工,1971年12月21日上船台,1973年12月25日试水,1977年12月20日下水,1978年5月5日系泊试验,1980年9月6日航行试验。
1981年11月18日, 401艇开始中修(401工程)。1987年1月17日下水, 12月8日交付海军.

1981年11月16日-12月17日,402艇进行长航试验(814任务),共31天,航程6272.6海里, 其中累计水下航行25天。总指挥北海舰队副司令员曲振侔,艇长李金奎。
1983年10-11月,402艇进行长航训练,共35天

1984年,鱼3型声自导深水反潜鱼雷定型
1984年12月25日,403艇入役。(1971年10月27日开工,1972年12月26日上船台,1975年3月18日试水,1983年10月31日下水,1984年3月15日开始系泊试验,1984年8月28日开始航行试验)
1985年11月20日-1986年2月18日,403艇进行了最大自持力考核试验,共90天,打破了美国潜艇“海神”号保持多年的世界纪录(84天)。总指挥是核潜艇基地副司令员杨玺,艇长孙建国。在黄海、东海海域航程达23625海里,水下航行69天,航程18868海里,其中最长一次水下航行25天。
1987年10月27日,091定型首制艇404艇入役。(1975年9月10日开工,1977年8月20日上船台,1978年12月10日试水,1985年12月26日下水,1986年1月17日-1987年3月系泊试验,1987年5月17日开始航行试验。))
1988年4月,404艇在南海海域成功进行深水试验(982任务)。4月21日第一航次180米预潜试验,实际潜至193米。4月29日第二航次深潜试验,潜至300m极限深度。5月12日第三航次水下全速试验(22节)。5月25日第四航次,大深度发射反潜鱼雷(鱼-3)试验。总指挥杨玺,艇长王福山
1988年,703所研制成功鱼-3甲反潜鱼雷)
1990年4月8日,**主席江泽民视察渤海造船厂,并参加405艇下水典礼。视察时,江泽民表示:“核潜艇不能断线。”

1990年12月,405艇入役。(1977年9月19日开工,1978年11月30日上船台,1980年4月26日试水)
1994年7月10日,**发布命令,授予海军北海舰队潜艇基地第十一艇员队“水下先锋艇”荣誉称号
1994年10月27-29日,在黄海公海海域发生美国“小鹰”号航空母舰同403艇长达72小时的对峙。**主席江泽民题词:“加强核潜艇部队建设,壮我国威,壮我军威。”

Auto Translation:

November 23, 1968, 091 boats started the construction of the 431 plants. November 6, 1969, on board units. April 4, 1970, to test the water.

1969 July created its first nuclear submarine crew team (eleven crew team) 36 people, boat Xi Yang, political commissar Cuigui Jiang. the end of April 1970, nuclear submarines ahead of schedule onshore mode heap, good quality.

1970年5 1 May, nuclear submarine reactors began commissioning onshore mode.

1970年7月17日2:00 am submarine land simulated heap began to improve power, July 30, the test reach full power, declared officially completed onshore simulate heap. October 1970, nuclear submarine base force generation.

1970年12 26, 401 boat launching.

1971年4月1 - Aug. 16, 2009, 401 boats completed mooring trials. April 30, the completion of the boat reactor installation. June, 401 boats first joint pilot started the whole boat, followed by a nuclear submarine reactor test start. July 1, 401 nuclear power boat for the first time, conducted a host commissioning and testing and commissioning of the power plant preliminary assessment.

1971年8月23日-1972 on April 23, the first stage of 401 boats sailing tests.

1972年8月. 20 - Oct 31, 2011, 401 boats were sailing trials expanded.

1972年11月December 1973, 401 boats dock repair.

from January to April 1974, 401 boat for the third phase of testing of navigation tests. In the experiment has three stages of 401 boats out to sea trials 26 times, the pilot project 174, running a total of 2705 hours the reactor, the cumulative range 6072 sea miles. August 1, 1974, 401 boats entered service, known as the "long march." Yang Xi's first captain. February 1975, the first branch in the North Sea Fleet submarine detachment formation.

1975年8 3, 401 boat design, production and stereotypes.


1980年12 30, 402 boats put into service. (July 25, 1970 started December 21, 1971 aboard Taiwan, December 25, 1973 to test the water, December 20, 1977 launch, May 5, 1978 mooring trials, 6 September 1980 sea ​​trial.)

1981年11 18, 401 boats started in the repair (401 projects). January 17, 1987 launch, December 8 delivered to the Navy.

1981年11月16 to December 17, 2009, 402 boats for long-endurance test (814 tasks), a total of 31 days, range 6272.6 sea miles, where the cumulative underwater 25 days. commander, deputy commander of the North Sea Fleet song Zhenmou, captain Li Jinkui.

October-November 1983, 402 boats for long-endurance training, a total of 35 days

1984, the fish three deepwater acoustic homing torpedo submarine stereotypes

1984年12 25, 403 boats put into service. (October 27, 1971 started 26 December 1972 on slipway, March 18, 1975 to test the water, October 31, 1983 launch, March 15, 1984 started mooring trials, August 28, 1984 began sea trials)

1985年November 20 - 1986 February 18, 403 boats were maximum holding force assessment test, a total of 90 days, breaking the U.S. submarine "Poseidon" was maintained for many years the world record (84 days). nuclear submarine base is deputy commander Commander Yang Xi, Sun Jianguo captain in the Yellow Sea, East China Sea range of up to 23,625 sea miles, underwater 69 days, range 18,868 sea miles, the longest time underwater 25 days. Oct. 27, 1987, 091 first system stereotypes 404 boats boats put into service. (September 10, 1975 started, August 20, 1977 aboard Taiwan, December 10, 1978 to test the water, December 26, 1985 launch, January 17, 1986 - 1987 March mooring trials, May 17, 1987 began sea trials.))

1988 April 404 boats in the South China Sea successful deepwater test (982 task). April 21 first voyage 180 m pre-dive tests, the actual dive to 193 meters. Apr. 29 second voyage deep dive test, dived to 300m depth limit. May 12 the third Test at full speed underwater voyage (22). May 25 fourth voyage, a great depth launch anti-submarine torpedoes (fish -3) test. commander Yang Xi, captain Wang Fushan.

1988 years, 703 fish -3 A successful development of anti-submarine torpedoes

1990年4 8, ** President Jiang Zemin visited Bohai Shipyard, and participated in the 405 boat launching ceremony an inspection, Jiang said: "submarines can not break." December 1990, 405 boats put into service. (September 19, 1977 started November 30, 1978 aboard Taiwan, April 26, 1980 to test the water )

1994年7 10 May, ** issued an order granting Sea Fleet submarine base eleventh crew team "underwater pioneer boat, "the honorary title

1994年October 27-29, the United States occurred in the Huanghai Gong sea waters "Kitty Hawk" aircraft carrier with 403 boats up to 72 hours of confrontation. ** President Jiang Zemin wrote an inscription : "Strengthening nuclear submarine force building, Zhuang Wei of China, Zhuang my army. "
 
Last edited:

A.Man

Major
Re: PLAN submarines Thread II

More Declassified China Nuclear Submarine Video:

CCTV Face to Face:

[video=youtube;Lx8cS1vB3-E]http://www.youtube.com/watch?v=Lx8cS1vB3-E[/video]
 