franco-russe
Senior Member
The site at 18 12 38 N 109 33 56 E is probably the main material depot for the construction project. There is a huge accumulation of tetrapods, used for building breakwaters, but the jetty that was the first thing to be built, in January 2009, has not expanded further. They have also been excavating a whole mountain.
The site at 18 12 05 N 109 34 20 E is probably administration and logistic suport.
From 18 12 21 N 109 32 07 E they are building a 1.7 km mole due south.
I do not see any tunnels, and do not think they are doing those any more. There is one at the nuclear submarine base, at 18 12 10 N 109 41 40 E, apparently without an exit tunnel.
The site at 18 12 05 N 109 34 20 E is probably administration and logistic suport.
From 18 12 21 N 109 32 07 E they are building a 1.7 km mole due south.
I do not see any tunnels, and do not think they are doing those any more. There is one at the nuclear submarine base, at 18 12 10 N 109 41 40 E, apparently without an exit tunnel.