Re: PLAN Carrier Construction
If aircraft should leave the ski ramp at 70% of the speed they need from a conventional cat then a cat built into the ramp and giving the same acceleration need only be half as long, 45 rather than 90 meters. The short run from the forward positions is some 130 meters in Adm K and Liaoning so such cats would free a deck length of 85 meters for spotting aircraft and much more from the third position.
To approach the quality of USN aircraft carrier operation PLAN has two ways: experience - immensely important - but also innovation. A carrier with cats in the ski ramp is truly STOBAR.
STOBAR is really an inappropriate name. The take off run on Adm K and Liaoning is longer for the two front positions, much longer for the third position than the length of the USN cats. And even so the speed at which aircraft leave the ski ramp is less than of those launched by cat from a flat deck.I'd like both of the first two carriers to be EMALS too, but it is a little fanciful for me to believe and any hypothetical reasoning for both carriers to be CATOBAR can be twisted around to be STOBAR too.
If aircraft should leave the ski ramp at 70% of the speed they need from a conventional cat then a cat built into the ramp and giving the same acceleration need only be half as long, 45 rather than 90 meters. The short run from the forward positions is some 130 meters in Adm K and Liaoning so such cats would free a deck length of 85 meters for spotting aircraft and much more from the third position.
To approach the quality of USN aircraft carrier operation PLAN has two ways: experience - immensely important - but also innovation. A carrier with cats in the ski ramp is truly STOBAR.