and more....
again @davidau ... all these images were posted, some only a few posts before !
Please take care a bit not to double all images.
and more....
Surely not the best image, but the best I could do within a few minutes ...
Looks indeed modified in comparison to the original demonstrator's bays ... and so the question remains: will now fit 3 PL-15 per bay ? ... IMO more likely than before !
View attachment 33191
The change will be from individual production or, perhaps, now mini batches of four aircraft to a standard batch size of a dozen or more aircraft. That would cause a step change in production rate which must be preceded by building the production plant probably in a larger hall than is used for initial production. That plant is likely being built now.So unless we see a greatly expanded production facility??, (always possible), I would suspect the production rate will slowly increase as means and processes become more streamlined.
The change will be from individual production or, perhaps, now mini batches of four aircraft to a standard batch size of a dozen or more aircraft. That would cause a step change in production rate which must be preceded by building the production plant probably in a larger hall than is used for initial production. That plant is likely being built now.
I think it is impossible to say if there 2 HP on a weapons bay or 3 matters of cms so difficult i have yet loock for it do comparisons 3 possible but not sure ...Nice one.
View attachment 33192