"尿" (pee) is a corruption of "料", which means scoop. The peeing section basically means the author is drip feeding the reader.
Proper nouns will mostly not be translated (since I, too, have no clue where the author came up with that) I will try to preserve the writing style as much as possible in this translation because it is too funny not to. Notes in the bracket are added by me.
The Earth Empire's latest class of star destroyers, the "核姿马尔" class, are being constructed in shipyards on planet "廖拉克斯勒" and "海特斯科尔" in secrecy. The reason for the concurrent constructions has been discussed previously in cjdby. The two ships are built from the blueprint by "胡伯奇伊索尔". This act [of concurrently building two star destroyers] has only been accomplished by the "亚美利加" empire in the history of Earth. The "海特斯科尔" company has build the modules for ship No. 1 and the earliest window for final assembly is in late November of the sixth year [of His Excellency] the Fifth [President of] the Earth Empire. The "廖拉克斯勒" company is preoccupied for the production of cargo ships for the Imperial Energy Company and the Interstellar Transport Company; However, due to its large production capacity, the company has started production in early May of the sixth year [of His Excellency] the Fifth [President]. At that time, [His Excellency] arrived at the "廖拉克斯勒" base by helicopter. The best spies of the Empire will be able to see the parts [of the "核姿马尔" class ship No. 2] after the maintenance of the first ship of "华尔马特" class is completed. [The spies] should be able to see [the modules on the] production line by late August of the seventh year [of His Excellency] the Fifth [President]. The first two ships of the "核姿马尔" class are of the same variant and will be followed by improved variants. This class of star destroyers of the Earth Empire has a very high starting point and its technological superiority can be maintained in the future by the continuous improvements in the subsystems.
So the take home message is that there are two new carriers, one in Jiangnan, one in Dalian. Both are of the same class. Jiangnan may start assembly this November. Dalian may start production after
Liaoning's maintainence is completed. Evidence of the module construction at Dalian would show up around August 2019.