Scheduled maintenance on Liaoning begins. Already the radar atop the main mast has been removed.

52738807214_ec082f435f_k.jpg
 

Cloud_Nine_

Junior Member
Registered Member
Wonder if Liaoning and Shandong would switch out type 382 for the new radar for 054B? Or if Fujian would be equipped with an extra search radar?
 

lcloo

Captain
I think this is second of scheduled major refit, not really MLU, the first major refit was in 2018, major work involved resurfacing of top deck and repainting of the bottom Hull. That was around 5 or 6 years after commission. Current refit is about 4 1/2 year after the 2018 refit.

I expect MLU to be carried out around 2035. CV16 should serve for 40 to 50 years from 2012.
 