Latest - CJ-2000 has entered the low-voltage component telemetry system hardware configuration bidding stage. In other words, CJ-2000AX has entered the verification machine bench test stage. This is the most critical step for aero engines!
It has been reported that CJ-2000 has been making faster progress compared to CJ-1000A when the latter was at similar development stage. Considering that CJ-2000 is believed to be an enlarged CJ-1000A (at least partly based on CJ-1000A), this is likely credible.