Chinese Engine Development

Zahid

Junior Member
Does anyone has any new about WS-13? Last thing I heard was that it was being tested on a FC-1 prototype in March 2010. Thanks in Advance.
 

Deino

Lieutenant General
Staff member
Super Moderator
Registered Member
....

The Y-20 has already been tested with the WS-20, ....

To admit I don't think so ! There are just two Y-20 flying and both with the venerable D-30 ... I actually can't think that after just so few flight (or such a brief test-phase) so far the WS-20 was already tested on it.

Deino
 

broadsword

Brigadier
There was a photo of a WS-20 engine in combination with DS-30 but on a flying IL-76. I don't think there is one with Y-20 and WS-20 engines..
 
Last edited:

LesAdieux

Junior Member
Here's the most interesting parts of the article translated by myself.

it was claimed that the WS-15 would finish flight testing in 2014 while the WS-10G would have its first flight in 2015; the CJ-1000A will have its first flight in 2016, an “Aerospace” engine will be first installed in 2016, and that a fifth generation turbofan with a thrust ratio of 15 will have its core components finished in 2016.


I think you got a translation problem, it didn't say the ws-15 would finish flight testing in 2014, it said the "验证机“ of the ws-15 would finish its test. "验证机“(I don't know the english word for it), is not even a prototype, before you build a prototype, you build a "验证机“ to test the basic design concept.
 

stibyssip

New Member
I think you got a translation problem, it didn't say the ws-15 would finish flight testing in 2014, it said the "验证机“ of the ws-15 would finish its test. "验证机“(I don't know the english word for it), is not even a prototype, before you build a prototype, you build a "验证机“ to test the basic design concept.

you're probably right. i'm not read up on chinese technical jargon, nor do i know all the stages of testing that aircraft engines have to go through before entering production. i took the term 验证机 to simply mean trial/testing aircraft, which gave the impression that the ws-15's "trial aircraft" would finish testing this year according to the timeline image mentioned in the article.

thanks for clearing things up, admittedly i did think the idea that the ws-15 would finish flight testing this year sounded dubiously optimistic, but it's what i took the article to be claiming.
 

Deino

Lieutenant General
Staff member
Super Moderator
Registered Member
Maybe it's the engine's core, which was already reported to be under test ! ... as such it would fit.

Anyway ... all hopes to see a WS-15-powered J-20 soon or hopes that it is already under test are pure dreams ... nice dreams, but dreams (for a few years to come).

Deino
 

latenlazy

Brigadier
Maybe it's the engine's core, which was already reported to be under test ! ... as such it would fit.

Anyway ... all hopes to see a WS-15-powered J-20 soon or hopes that it is already under test are pure dreams ... nice dreams, but dreams (for a few years to come).

Deino

The rumour mill suggests they completed core testing at the end of last year and started building a prototype/demonstrator around the same time, which sounds about right given that they started construction of the core as early as 2006. My guess is that that end of 2014 date is when they plan on validating the entire design from LP to AB. After that they'll probably have a proper prototype and begin endurance and altitude tests.
 
Last edited:
Top