China's transport, tanker & heavy lift aircraft

Deino

Lieutenant General
Staff member
Super Moderator
Registered Member

Attachments

  • Y-20 20002 - maiden flight 16.12.13 - 2.jpg
    Y-20 20002 - maiden flight 16.12.13 - 2.jpg
    28.1 KB · Views: 125

Engineer

Major
I wonder if refuel pluming comes as a standard on the Y-20. There would be a little increase in weight, but it would allow each plane to serve dual functions. Here is an example. Under normal circumstances, the planes can be left as transports. When there is a huge demand for refueling aircraft, extra fuel tanks can be installed in the cargo bay and connected to the refuel pluming. I think the likelihood is high given China has too much demand on transports and refueling aircraft to dedicate airframes for a single purpose.
 

Blitzo

Lieutenant General
Staff member
Super Moderator
Registered Member
It would definitely be nice if all Y-20s could be converted to tankers ala A400M, and I'm sure it's not technically difficult, I just wonder whether the PLAAF had the foresight to make that a request.

Also, it discourages me that the prototypes all lack refuelling probes, not to mention the fact that all "large" planes the PLAAF have developed in recent times also conspicuously lack refuelling probes; H-6K, Y-9, etc.
 

i.e.

Senior Member
It would definitely be nice if all Y-20s could be converted to tankers ala A400M, and I'm sure it's not technically difficult, I just wonder whether the PLAAF had the foresight to make that a request.

Also, it discourages me that the prototypes all lack refuelling probes, not to mention the fact that all "large" planes the PLAAF have developed in recent times also conspicuously lack refuelling probes; H-6K, Y-9, etc.


Why bother.
probe-and-drogue is so slow compare to the tankerage needed itself.
 

Blitzo

Lieutenant General
Staff member
Super Moderator
Registered Member
Why bother.
probe-and-drogue is so slow compare to the tankerage needed itself.


... Better to have a provision for slow air to air refuelling rather than none at all...
 

i.e.

Senior Member
... Better to have a provision for slow air to air refuelling rather than none at all...

its just ridiculous to refuel a H-6K with a probe-and-drogue that they have riught now.

plus, inflight refuel is probablly the most "high-Gain" task a pilot will face and most of transport category aircraft are not designed to meet that level of handling quality requirement.

Chinese have their own version of Mil-std-1797 and it is close to Mil-Std-1797.

inflight refuel is categorized in the same flight phase category as
"
a. Air–to–air combat (CO)
b. Ground attack (GA)
c. Weapon delivery/launch (WD)
d. Aerial recovery (AR)
e. Reconnaissance (RC)
f. In–flight refueling (receiver) (RR)
g. Terrain following (TF)
h. Antisubmarine search (AS)
i. Close formation flying (FF)
j. Low–altitude parachute extraction (LAPES) delivery

"

Please, Log in or Register to view URLs content!


its down nright dangerous and could very well destroythe airplane if they tried it.
 

A.Man

Major
Xifei Final Assembly Plant 369 Building

Please, Log in or Register to view URLs content!


本报讯 日前,西飞369号厂房工程在中国建设工程“鲁班奖”评比中,脱颖而出,摘得桂冠。

369号总装厂房工程总建筑面积26966平方米,工程总造价1.14亿元,于2009年8月28日竣工验收,并交付使用。

369号总装厂房工程为单层厂房,其建筑面积、跨度、檐口高度均创造了西飞建厂以来工业厂房尺寸之最,施工技术难度非常大。该工程在施工过程中大量采用了新技术、新工艺、新材料,集节能、环保、新颖于一身,曾先后获得陕西省建筑行业“长安杯”、“华山杯”。

Auto Translation:

Recently, XAC 369 plant engineering construction projects in China, "Luban" competition, to the fore, won the title.

No. 369 assembly plant total construction area of ​​26,966 square meters, total project cost 114 million yuan, on August 28, 2009 final acceptance and delivery.

No. 369 is a single assembly plant engineering plant, its construction area, span, eaves height have created the most industrial plants since the size of XAC construction, construction technology very difficult. The works in the construction process uses a lot of new technologies, new processes, new materials, set energy saving, environmental protection, in a novel, he has also earned Shaanxi Province in the construction industry, "Chang cup", "Mountain Cup."

(XAC)


6ycq.jpg


1ox4.jpg


8jli.jpg


Construction the Heated Floor of 369 Building

Also A New Building, No. 628 is under Construction

(集团)有限责任公司628号总装厂房项目收藏 已收藏 取消 工程信息更新提醒 已设置提醒 取消 导出Word文件 导出Excel文件 查看使用向导 功能操作 2收藏自己喜欢的项目信息
将适合自己的项目收藏,如果项目还在前期阶段,可关注其更新动态,等待适合自己的跟进的实际。
项目详情 项目联系人(9) 设备材料 跟进记录(2) 相关项目 编号:186329项目概况工程地区 西安市 更新时间 2013-11-25(发布时间:2013-09-03)温馨提示:请注意信息发布与更新时间,该项目部分信息会随着时间推移发生变化。
项目类别 工业建筑 工程类型 商业、新建
项目阶段 主体施工 温馨提示:项目阶段会随时间推移而变化,请查看项目更新时间、项目周期来综合推算阶段变化。 跟进时间:2013-11-25 建筑层数 1层
建筑面积 41000平方米 占地面积 --
工程估价 6000万 建设周期 2013年08月 至 2014年12月
项目地址: 陕西省西安市阎良... 查看详细>>
项目简介: 西安飞机工业(集团)有限责任公司628号总装厂房项目

项目为1层框架结构厂房、5层现浇钢筋混凝土框架结构附楼。
[查看详细]
可能用的设备材料 1、外墙装饰,门窗玻璃,防水防腐,油漆涂料,
2、卫浴洁具,墙地面砖,陶瓷制品,光源灯具,
3、高压电器,变压器,滤毒式排风,防火阀,
4、低压电器,变配电,仪器仪表,电线电缆,
5、防雷接地,供水设备,管材管件,阀门组件.


跟进记录(内幕) 共有 2 条跟进记录,由天工网专业团队挖掘到的项目更新与内幕消息,帮助您更好的把握商机!查看详细>> 来源于
Please, Log in or Register to view URLs content!



Auto Translation:

Xi'an Aircraft Industry (Group) Co., Ltd. No. 628 assembly plant project engineering information collection has been updated to remind collections canceled has set a reminder to cancel the export Word document using the wizard to export Excel File Viewer function operation two collections of their favorite project information collection will fit your project, if the project is still early stage, may be concerned about their updates, waiting for their follow-up of the actual . Project Details Project Contact (9) equipment and materials follow-up records (2) Related Item Number: 186329 Project Overview Project area Xi'an Updated 2013-11-25 (Published :2013 -09-03) Tips: Please note that the information publish and update time, the project will be part of the information changes over time. Project category type commercial construction industry, the new main construction phase of the project Tips: project phase will change with the passage of time, check out the project update, a comprehensive project cycle to calculate phase change. Follow-up time :2013-11-25 floors one floor building area of 41,000 square meters footprint - Estimated 60 million project construction period from August 2013 to December 2014 Project Address: Xi'an, Shaanxi Province Yanliang .. View Details >> Project Description: Xi'an Aircraft Industry (Group) Co., Ltd. No. 628 assembly plant project project is a story frame structure plant , five layer cast reinforced concrete frame structure annexe. [View Details] equipment and materials may be used in one, wall decoration, glass doors and windows, water corrosion, paint, 2, sanitary ware, wall and floor tiles, ceramics, light fixtures, 3, high-voltage electrical appliances, transformers, canister-style row wind, fire dampers, 4, low voltage electrical appliances, power distribution, instrumentation, wire and cable, 5, lightning protection and grounding, water supply equipment, pipe fittings, valves and components. follow-up record (insider) recorded a total of two follow-up by the day net professional team to work digging project updates and insider information to help you better grasp the business opportunities! View Details >> from
Please, Log in or Register to view URLs content!
 
Last edited:
Top