Aircraft Carriers III

asif iqbal

Lieutenant General
Europeans together are strong and they have the equipment to match

Italians alone can seriously deter Russia ,but unfortunately no one has spine

A joint European CSG and MEU is a serious force scores of assets

Let's hope things change fast
 

asif iqbal

Lieutenant General
Mistral is really tall ! So high out of the water

Egypt and turkey two rising eastern Mediterranean naval powers
 
I guess it's important USS Nimitz starts sea trials after spending 20 months in port
USS Nimitz (CVN 68), the lead ship of the class of U.S. Navy’s nuclear-powered aircraft carriers, has started sea trials after spending 20 months in port.

Nimitz got underway Oct. 5 for sea trials, following an extended planned incremental availability (EPIA) that started February 2015 at Puget Sound Naval Shipyard in Bremerton, Washington.

Nimitz entered the shipyards for its fifth major maintenance period and completed the largest maintenance period to date without bringing the carrier into dry dock, according to Cmdr. Mark Yates, Nimitz chief engineering officer.

“We’ve repaired and replaced quite a few systems,” said Capt. John Ring, commanding officer of Nimitz. “It’s been a great relationship over the last two years working with Shipyard Project Superintendent Brian Fazio and his team, dealing with the many challenges we’ve had in the yards.”

During this period more than 14 major upgrades were made to Nimitz with more than 600,000 man-days of work accomplished by ship’s force and civilian personnel.

“Teams from Combat Systems Department removed, refurbished and reinstalled over 150 antennas, saving over $3 million in contractor costs,” said Cmdr. David Gast, Nimitz combat systems officer and native of Miami. “We’ve updated every element of the ship’s satellite communication, and information processing suites were upgraded or replaced.”

Combat systems also completely modernized the ship’s command, control, communications, computers and intelligence (C4I) capability with numerous upgrades. The ship’s integrated network was updated to the new consolidated afloat network enterprise services (CANES) system.

During the EPIA, modifications were made to the ship’s defenses, adding two MK-38 anti-ship guns and a anti-torpedo defense system.

A rebuild of the ship’s second service turbine generator was completed, as well as a complete overhaul of all four distilling units creating fresh water for the ship.

The interior of the ship wasn’t the only focus of the makeover. Over 100,000 square feet of flight deck non-skid was removed, and the ship performed major repairs to the jet blast deflectors and ship structure.

Nimitz also implemented new training programs for its sailors to get ready for sea and maintain at-sea readiness.

Nimitz was the first afloat command Navywide to implement the navy afloat training strategy (NAMTS) program. The program has earned sailors critical naval enlisted classifications (NECs) that will allow Nimitz to make critical repairs on board without being contracted out.

The work completed by shipyard and ship-force personnel will be reviewed in the coming months by the board of inspection and survey (INSURV) material inspections (MI).

“We are working on the oldest carrier, and this is one of the most complex availabilities I think the Navy has seen in recent years,” said Brian Fazio, the shipyard project superintendent. “We have had an incredible partnership with continued respect for one another, and we worked hard to get our work done safely.”
source:
Please, Log in or Register to view URLs content!
 
here's my rant https://www.sinodefenceforum.com/aircraft-carriers-iii.t7304/page-85#post-395328
dated Apr 10, 2016 (with reference to previous announcements), and here's NavyTimes now:
Delivery of Navy's costliest aircraft carrier delayed again
Officials say the U.S. Navy's most expensive aircraft carrier will miss another delivery deadline.

Navy spokeswoman Capt. Thurraya Kent tells
Please, Log in or Register to view URLs content!
USS Gerald R. Ford won't meet November's delivery deadline.

The $12.9 billion USS Gerald R. Ford is being built at Huntington Ingalls Industries Inc. in Newport News.

Kent says in June and again in July, two of Ford's electricity-generating main turbines had problems.

Tests are being conducted, and Kent says a new delivery date has not been set.

The carrier had been expected to be delivered in 2014.
source:
Please, Log in or Register to view URLs content!
 

Obi Wan Russell

Jedi Master
VIP Professional
Italy Is Prepping Its Aircraft Carrier to Handle Stealth Fighters
Please, Log in or Register to view URLs content!
It's a little incorrect when it states the QECs are being 'modified' to take the F-35B, when they were designed from the start to take them. It also gives the impression that the modifications to other ships are a huge deal because they will cost 'millions of dollars'. When it comes to aircraft carriers, everything costs a lot. Replacing the toilet seats is expensive to the untrained eye. Relative to most of the work carried out on aircraft carriers in for maintenance, this is actually fairly minor. The Australians are making a big deal about how expensive it would be to modify the Canberras for the F-35B, even though the original Spanish design of the ships was specifically with F-35B operation in mind. The Aussies say they retained the ski jump because it would be too expensive to redesign the bows, but these ships also have none of the features needed to operate the Lightning? Make your minds up, which is it? I think the only think preventing the Aussies from operating the Lightning at sea is politics, both Governmental and inter service, and it won't go away for years...
 
now I read US Carrier Delays Continue — And Another 'Gap' Could Affect The New Administration
It’s almost a given that when a new administration takes over in Washington, international opponents find ways to test the will of the new leadership. Russia and China, Iran and North Korea, ISIS and Al Qaeda can all be expected to take actions that will put pressure on the new president to show what he or she is made of. And when the issues arise next year, a new set of leaders are likely to ask the proverbial question, “Where are the carriers?”

The answer, at least in the first weeks of the next administration, may not be what people want to hear.

The carrier Dwight D. Eisenhower is patrolling the waters of the Persian Gulf this fall as the single most powerful asset of US Central Command. After months of launching strikes against ISIS targets in Syria and Iraq, the ship is scheduled to be relieved in January by the carrier George H. W. Bush. Ike will then head home to Norfolk and complete a seven-month deployment. Keeping the deployment to that length is a key goal of the Navy, which is trying to avoid cruises turning into eight-nine-ten-month affairs that wear out people and equipment.

But there’s a problem. The Bush is running behind schedule, having come out of a maintenance period at Norfolk Naval Shipyard that initially was to have been completed in six months, but instead lasted 13. The ship, her air wing and the rest of her strike group should have had most of this year to train up in proper fashion and deploy in December in time to relieve the Eisenhower. But that original ten-month training period dropped to eight months when the Navy first announced the overhaul would go long, then shrank to four months by the time the Bush returned to the fleet in late July.

Even then, the Navy organization in charge of making sure the Bush strike group is fully trained appears to have been unprepared to quickly implement a plan to deal with the delay, and several more weeks went by while Norfolk-based US Fleet Forces Command (USFFC) seemingly struggled to determine the way ahead and make a choice between compressing the training period to deploy on time or delaying the deployment and train up more fully.

A delay in deploying could mean the Eisenhower’s cruise will need to be extended, or Ike could come home on time and leave a carrier gap in the CENTCOM and European Command region – an unattractive prospect when chances are high the Russians, ISIS, Al Qaeda or Iran could provoke some sort of incident in those theaters.

The Bush deployment shouldn’t necessarily affect the situation in the Pacific, where Pacific Fleet carriers have recently shifted from sharing CENTCOM duties with Atlantic-based strike groups to cruising the western Pacific in and around the South China Sea.

But the root cause of the Bush’s overly-long overhaul – naval shipyards suffering from budget cuts and workforce reductions, unable to keep up with the demand from the fleet – certainly is affecting both fleets. On Oct. 5, the carrier Nimitz emerged from Puget Sound Naval Shipyard in Bremerton, Washington, to carry out sea trials after a 20-month overhaul – four months longer than planned. It is not clear, however, if that delay will affect future West Coast carrier deployments, as at least one carrier is ahead of Nimitz in the deployment rotation.

And the problems are not new. In October 2014 Fleet Forces Command announced that the Eisenhower’s 2013-2015 overhaul at Norfolk would run six months long, and the carrier Harry S. Truman had to step in and cover a deployment that Ike was unable to make. Eisenhower finally deployed on June 1, 2016.

Problems with the Navy’s four shipyards – Norfolk; Puget Sound; Pearl Harbor, Hawaii; and Portsmouth, Maine – have been cited by Navy officials for several years. Admirals decry budget cuts that have imposed workforce reductions in all the yards, along with inconsistent funding from years of delayed budgets. The fleet’s ships are caught in a vicious cycle – operational tempo has been high, meaning ships routinely miss out on scheduled overhauls, called “availabilities” by the Navy. Ships that do come into the yard wind up needing more work than planners scheduled them for, and coupled with reduced work forces, the overhauls run long, often producing delays in work on other ships. Training regimes are adversely affected, and the operational availability of a ship could be delayed for months or more.

Naval Sea Systems Command, the entity that oversees the Navy’s shipyards, does not shy from admitting the problem.

“The primary reasons the [Bush’s availability] took longer than planned is that the shipyard's workload exceeded its capacity and shipyard performance challenges,” said Rory O’Connor, a spokesman for NAVSEA.

“The workload assigned to the four naval shipyards has increased over the last several years,” O’Connor explained. “While the Navy increased the size of the workforce, the workload increased faster than our capacity. Norfolk Naval Shipyard allocated resources to assigned availabilities based on priority, and the resulting manning shortfalls delayed the schedule.”

A similar situation affected the Nimitz in Puget Sound.

“Nimitz was also adversely affected by capacity issues,” O’Connor said, adding that, “some of the extension of this availability was also due to the late identification of repair work that was not in the original schedule.”

O’Connor noted that the four shipyards are rebuilding their work forces. Since 2013, he said, “the Navy has hired approximately 14,000 new shipyard workers” – a number that reflects plus-ups at all four yards as well as new hires replacing retired or laid-off workers.

The civilian work force at Norfolk and Puget Sound -- each more than twice as large as the two smaller yards -- has grown since September 2013. Norfolk has added 1,425 employees for a total of 10,542, while Puget Sound has grown by 2,549, up to 13,425 employees.

But the problem isn’t solved quickly by simply hiring workers. “Employees need to be trained,” O’Connor said, “and it takes time to gain experience.”

To cope, the yards have begun farming out some nuclear submarine overhauls to commercial yards, a change in the practice of recent years where all nuclear overhaul work was conducted in the naval yards. At least four submarine overhauls are or will be carried out in private yards, at General Dynamics Electric Boat in Groton, Connecticut, and Huntington Ingalls Industries (HII) Newport News Shipbuilding in Newport News, Virginia – the only yards in the US that build nuclear submarines.

Delays in overhauls aren’t just attributed to the difficulty of performing the work when a ship is in the yard – there are also issues with planning the availabilities. In general, a shipyard might have a year to plan an overhaul such as the Bush’s. Work needs to be identified, the length and scope of a job determined, sequencing laid out, parts and materials ordered in advance, workers scheduled to be available. Personnel reductions have affected planning departments as well as the skilled labor force.

Norfolk Naval Shipyard led the planning work for the Bush’s 2015-2016 overhaul. Some sources assert there were problems carrying out the work, with some planning being transferred to HII – which in turn is reported by some to have had issues, also said due to being brought in at a later date.

HII, along with General Dynamics NASSCO, had significant pieces of the Bush work, but under “discrete” contracts issued for particular jobs.

But O’Connor said Norfolk Shipyard had the lead all the way.

Norfolk Shipyard “began planning the planned availability for the Bush in the summer of 2014 and maintained control of the planning duties for the duration of the availability,” O’Connor said. “HII and other private companies were brought in to help augment the Norfolk workforce by executing specific, discrete work.”

HII, working under a $23.8 million contract issued June 22, 2015, was “to execute nuclear propulsion and complex modernization work aboard the Bush but was not tasked with planning the entire availability,” O’Connor said.

GD NASSCO received two contracts totaling $42.4 million to work on the Bush.

But while the shipyards struggled to complete work on the carrier and the overhaul stretched well into 2016, it is not clear Fleet Forces Command was preparing plans to handle the compressed training period the strike group would need.

USFFC actually has a plan to make it easier for carrier forces to surge should the need arise. The Optimized Fleet Response Plan (OFRP) coordinates all the commands and entities needed to prepare a strike group to deploy. OFRP, a more refined version of the Fleet Response Plan, is still relatively new and untried, but has been cited by USFFC commanders as a key component to execute the command’s responsibility to man, train and equip the Atlantic Fleet’s carrier groups.

The plan was cited prominently in USFFC’s Oct. 6, 2014, statement discussing the Truman-Eisenhower deployment swap.

...
... goes on right below because of size-limit; source:
Please, Log in or Register to view URLs content!
 
Top