Quote posting @00CuriousObserver's post in the PLA Navy News thread: Namely, the construction of the first two 095 SSN boats is already underway, with the first improved 095 variant i.e. the 095A SSN in the works, per the Guancha Trios.
Should be a development strategy similar to that of Type 093. The first batch (2 or 4) is used to verify the basic platform such as structure/reactor/propulsion system, and then improve the subsystem performance in subsequent batches
 

para80

Junior Member
Registered Member
Quote posting @00CuriousObserver's post from the PLA Navy News thread: Namely, the construction of the first two 095 SSN boats is already underway, with the first improved 095 variant i.e. the 095A SSN in the works, per the Guancha Trios.
FWIW this gels with what I am hearing "from the other side" of the grapevine. However, I havent seen any imagery yet.
 

Blitzo

Lieutenant General
Staff member
Super Moderator
Registered Member
FWIW this gels with what I am hearing "from the other side" of the grapevine. However, I havent seen any imagery yet.

I wouldn't be surprised if the first imagery of 09V is when the lead hull is a satellite picture taken as it is wheeled out of the assembly hall for launch. Like the same as the first imagery for 09IIIB
 

ENTED64

New Member
Registered Member
FWIW this gels with what I am hearing "from the other side" of the grapevine. However, I havent seen any imagery yet.
Submarine construction takes a long time especially considering this is the first of a new class of submarines that are almost certainly very different from the previous class. If they just started construction within the last few months it could still be years before we get any images and that's if everything proceeds according to schedule.
 

sunnymaxi

Major
Registered Member
Submarine construction takes a long time especially considering this is the first of a new class of submarines that are almost certainly very different from the previous class. If they just started construction within the last few months it could still be years before we get any images and that's if everything proceeds according to schedule.
if we see tender announcements of different parts/components in 2022-2023. seen 13m hull diameter on satellite imagery. also from credible source, first unit of type 095 has been under construction for quite some time.

so ''last few months'' statement is not correct.
 

ENTED64

New Member
Registered Member
if we see tender announcements of different parts/components in 2022-2023. seen 13m hull diameter on satellite imagery. also from credible source, first unit of type 095 has been under construction for quite some time.

so ''last few months'' statement is not correct.
I guess we will have to wait and see. I'd be somewhat surprised if construction started in 2023 I think 2024 is more likely.
 

Neurosmith

Junior Member
Registered Member
yeah.. we will have to wait and see.

now we got the news, two type 095 SSNs currently under construction with one improved 095A.
There was a rumor that the 09V might appear some time this year.

The 09VA is interesting, as its existence might imply that the first 09V units might not represent the "full configuration" of the project, likely to meet certain deadlines.
 