henri K wrote at forummarine that the number of type 055 comissioned at the first batch is 4 and that its construction is under way in JN shipyard.
Have anyone saw any mention of that anywhere else?
henri K wrote at forummarine that the number of type 055 comissioned at the first batch is 4 and that its construction is under way in JN shipyard.
Have anyone saw any mention of that anywhere else?
I'd be surprised if they weren't in construction. The steel-cutting ceremony of the first unit occured in late 2014.
Does anyone here have any idea on which hangar in the militar area is the first hull being built? i mean, i think that there are also type 052d hulls being built there (i havent keep up with the type 052d thread) so is there any hangar that right now seems empty?
Only one building hall has been used for the last few years for 052D serial production so they have another one that can potentially be used for 055. It is conceivable that they may simultaneously work on a 052D and a 055 or even two 055s at the same time, eventuallyDoes anyone here have any idea on which hangar in the militar area is the first hull being built? i mean, i think that there are also type 052d hulls being built there (i havent keep up with the type 052d thread) so is there any hangar that right now seems empty?
Does anyone here have any idea on which hangar in the militar area is the first hull being built? i mean, i think that there are also type 052d hulls being built there (i havent keep up with the type 052d thread) so is there any hangar that right now seems empty?
if it has started construction at JN that corresponds with the construction ceremony from a while ago.
The steel-cutting ceremony of the first unit occured in late 2014.