I think our posts just overlapped, are we looking at the 11th unit?
Ha Ha! this is the 20th 054A.
I think our posts just overlapped, are we looking at the 11th unit?
I think our posts just overlapped, are we looking at the 11th unit?
I would say 2 more are on the cards to complete 6 FFG Flotillas that's two for each fleet of a modern FFG design
I think that's it for this year, unless we are very lucky we might not see anymore, next year should compete the FFG production run and the next iteration should emerge if that's indeed the Type 054B of which they could build up a 3rd FFG Flotilla for each fleet leading onwards from the Type 054A, that would mean 8-12 units of the Type 054B
The design of the Type 054B should enable more flexibilty to allow for launching of UAV, under water vehicles, mine clearing, insertion of special forces and everything that a 21st century FFG needs
Also include a universal VLS that has multi role capability, maybe adding in a 48 VLS is out of the question but certainly giving it land attack capability would enhance its scope of operations
Type 052D is a huge improvement over the Type 052C as such the Type 054B should be a huge improvement over the Type 054A
I would say 2 more are on the cards to complete 6 FFG Flotillas that's two for each fleet of a modern FFG design
I think that's it for this year, unless we are very lucky we might not see anymore, next year should compete the FFG production run and the next iteration should emerge if that's indeed the Type 054B of which they could build up a 3rd FFG Flotilla for each fleet leading onwards from the Type 054A, that would mean 8-12 units of the Type 054B
The design of the Type 054B should enable more flexibilty to allow for launching of UAV, under water vehicles, mine clearing, insertion of special forces and everything that a 21st century FFG needs
Also include a universal VLS that has multi role capability, maybe adding in a 48 VLS is out of the question but certainly giving it land attack capability would enhance its scope of operations
Type 052D is a huge improvement over the Type 052C as such the Type 054B should be a huge improvement over the Type 054A
As 20 054s and 40 056s put into service. I think for the 054B we need many years to wait .
True but if you take a look at the number of ships needing decommissioned over the next few years then it's doesn't seem like a lot
"adding capacity" may not be on the cards but just matching the decommissioning rate could allow for Type 054B to slip in
Anyway no such ship even exists on paper nor have we ever heard a Type 054B design, we are just assuming this based on logical thinking which we know doesnt always apply to PLAN which is why its exciting to follow PLAN compared with other navy's
True.........but there has been some discussion on Chinese miltary websites recently on the subject of the 054B with the usual images.
But.....in reality, as the 054A has been in production for some while now, i think we can assume that a successor class is at least at the design stage now!
See:can someone remind me as to how many crew the type 54 requires?
are they planning any asw upgrades for the ffg?