00X/004 future nuclear CATOBAR carrier thread

kickars

Junior Member
This is my attempt at summing up what pop3 said so far:

1. The 4th carrier for the PLAN, CV-19 would be nuclear powered. That should mean CV-19 is Type 004.

2. The 4th aircraft carrier for the PLAN, CV-19 is still in design and development stages. (Not sure about construction, because foreign sources has said that the construction has already begun?)

3. After Liaoning CV-16, the PLAN and CSSC originally planned to go right ahead with CATOBAR with steam catapults for the 2nd carrier, CV-17. However, the government leadership (here I presume CMC?) said no, and tell them to copy-paste from Liaoning first for the CV-17. So the CATOBAR carrier plan was pushed towards the 3rd carrier, i.e. CV-18.

4. CV-18 was originally planned to have steam catapults as the R&D is completed, but EMALS catapult's R&D work progress is also good, prompting the government leadership (here I presume CMC?) to delay the construction of CV-18 by one year in order to allow design changes for the steam catapults to be replaced with EMALS catapult on CV-18.

5. Not a single word about the YJ-XY missile.

I gotta say that the sudden decision to replace steam with EMALS during construction of a conventionally-powered supercarrier is truly a bold action to take.

Please correct my summary if there's any mistake in it.
You are right. But call the fourth carrier “004 Carrier” or “Carrier 004”, please? In recently years, it is clearly PLAN does not use the world “Type” in its carrier designation.

Liaoning = 001 Carrier = CV-16
Shandong = 002 Carrier = CV-17
The 3rd one = 003 Carrier = CV-18 (highly likely)
The nuclear one Pop3 talks about = 004 Carrier = CVN-19 (possible designation)
 

A.Man

Major
Type 001->Carrier 001->CV 16->Liaoning
Type 002->Carrier 002->CV 17->Shandong
Type 003->Carrier 003->CV 18->Unknown1
Type 003->Carrier 004->CV 19->Unknown2 (If it will be the same design as Unknown1), or
Type 004->Carrier 004->CV 19->Unknown2 (If it will be a New design deferent from Unknown1)
 

A.Man

Major
pop3 used to imply he will add some fake content in what he said about equipment, he also said that the 3rd carrier will be steam catapult. So don't fully believe what he said.
Pop3 also said: The magnetic catapult was developed so fast. PLAN decided to change the original steam catapult design. Meanwhile, the 003 carrier construction had to stop for more than one year.
 

texx1

Junior Member
The third CV was planned to have steam catapults, the product from Shanghai Hengshan Road No.10 (Dunno what it is), monitored by PLA HQ but not by navy at that time.

Hengshen Road No 10 refers to the Chinese Shipbuilding industry Group Corporation (CSIC) 704 research institute, specializing in R&D of electromechanical equipment and systems for ships. It focuses on ship integrated power supply system, ship special auxiliary mechanical and electrical equipment.

Please, Log in or Register to view URLs content!
 

texx1

Junior Member
Hengshen Road No 10 refers to the Chinese Shipbuilding industry Group Corporation (CSIC) 704 research institute, specializing in R&D of electromechanical equipment and systems for ships. It focuses on ship integrated power supply system, ship special auxiliary mechanical and electrical equipment.

Please, Log in or Register to view URLs content!

Sorry about the typo. I meant Hengshan, not Hengshen.
 

taxiya

Brigadier
Registered Member
This is my attempt at summing up what pop3 said so far:

1. The 4th carrier for the PLAN, CV-19 would be nuclear powered. That should mean CV-19 is Type 004.

2. The 4th aircraft carrier for the PLAN, CV-19 is still in design and development stages. (Not sure about construction, because foreign sources has said that the construction has already begun?)

3. After Liaoning CV-16, the PLAN and CSSC originally planned to go right ahead with CATOBAR with steam catapults for the 2nd carrier, CV-17. However, the government leadership (here I presume CMC?) said no, and tell them to copy-paste from Liaoning first for the CV-17. So the CATOBAR carrier plan was pushed towards the 3rd carrier, i.e. CV-18.

4. CV-18 was originally planned to have steam catapults as the R&D is completed, but EMALS catapult's R&D work progress is also good, prompting the government leadership (here I presume CMC?) to delay the construction of CV-18 by one year in order to allow design changes for the steam catapults to be replaced with EMALS catapult on CV-18.

5. Not a single word about the YJ-XY missile.

I gotta say that the sudden decision to replace steam with EMALS during construction of a conventionally-powered supercarrier is truly a bold action to take.

Please correct my summary if there's any mistake in it.
I suggest you drop the word "Type" in all references to the ships. Either CV-19 or 4th ship. Because by now it is almost certain that these numbers are not PLAN "Types" which we won't know for a long time.
 

taxiya

Brigadier
Registered Member
Type 001->Carrier 001->CV 16->Liaoning
Type 002->Carrier 002->CV 17->Shandong
Type 003->Carrier 003->CV 18->Unknown1
Type 003->Carrier 004->CV 19->Unknown2 (If it will be the same design as Unknown1), or
Type 004->Carrier 004->CV 19->Unknown2 (If it will be a New design deferent from Unknown1)
001, 002, 003, 004 are certainly not the type number like Type-55 destroyers. They are just sequence numbers. We should not invent something for PLAN when we already know they are not types, or when we know nothing about it.
 