Dear all,
Military Analyst Programme on 3rd August brings you the subject of “What Could be Determined from its Disappearance for Almost 7 Month?” The guest today is Mr Song Zhong Ping (SZP), a former missile instructor from the PLA Second Artillery Corps.
First cutscene introduces the timeframe of J-20’s prototype 2001, 2002 and then 2011, 2012, 2013 and 2015. However, there is a disappearance of 7 months after last 2015’s flight.
When asked about why on earth did it disappearance for such a long period which is unusual, SZP replies that from the photo illustrations on screen, those 00s batch are for “Engineering Verification Testing (EVT)”. Its main tasks are testing of aero dynamics of the airframe, electronics avionics testing as well as flying controls. Based on the EVT’s foundations, then it comes the prototypes, hence from 2011 – 2015, these are prototypes.
The concept of an airplane’s prototype is the freezing of foundation based on the EVT’s. ON the prototype, a lot of test will be conducted. For example, those EVT airframes are for testing of aero dynamics, avionics and flying controls and also tasked with testing of its stealth capabilities. After the tests, the prototypes are created and modified in order to perfect the machine.
A stealth aircraft, similar to 3th gen and 4th gen, has to complete at least 2000 flights, before it’s being turned into the “Finalized Design” frame. If 201Xs were to fly in batches, the 2000 flights would be divided up as compared to only one prototype. This is to reduce the number of flying hours per prototypes to advance to its finalized stage which in turn translates into operational deployment stage. Therefore, in future, if there is a fifth prototype, it would have been a different from the previous 4 prototypes. It might not be a “201X”, rather it might being called “202X”.
Second cutscene brings us to see the 2015’s test flight, from that test flight; we see a reduction in the tail wings. Comparing 2001 & 2015, there are huge differences. In 2015, observers observed there are a stronger cockpit, reduction of tail wings and a different set of air-intake inlets. HD images of 2015 are exposed to the media.
Also, military hobbyists compared 2013 & 2015, there are only slightest changes. From the production of the 4 prototypes of J-20 within a short time span, some speculates the finalized stage and production stage. In additional, there was also a rumor of 2016 being built together with 2015. The timeframe between each prototype of 2012 and 2013 were quite near. Therefore, the 2016 model is expected to come out soon. These prototype testings will shorten the timing to operational status. However, it has been 7 months passed since 2015, and there are not sights of a 2016, hence the attention of its status now.
The host then reiterates that there are 6 prototypes, however now the situation to all is still having high expectations and speculations in hoping of more test flights and modules to test in order to be operational. The host then asked SZP how was the feelings and expectations of people during the 2015 came out.
Mr SZP replies that the 2015 is actually a fusion of all modifications and data gathered from the previous test flights. These modifications included the LCD display which is part of avionics system was shown to masses. The previous LCD screens on previous test airframes are not the finalized product to be used on 2015, now the 2015 shows a new LCD display panel. Other notable changes are the reduction of wings’ edges, which during all previous test flights were changed, modified and perfected into what we have seen. The engineers think that these reductions would increase stealth capabilities as well as aerodynamics of the J-20 final production model. However, SZP also speculates that as compared to previous test frames, although 2015 does have a minor change in appearance, there might be changes in flying control system and its software as well. He also makes comparisons between flying system software differs between F22 and F35 during their pre-production to production stage. Therefore, for a non-operational J-20 now, the software & hardware itself is still not the fully finalized product yet. Once all these software and hardware are froze, it might signify a small production batch for version 2015 J-20.
The various J-20 prototypes