The imagined US Navy: Before the war begins, the reserve fleet will be restored to fight to the death with the PLAN
The real US Navy: The dockyard is already overloaded, and the existing fleet cannot even be repaired on schedule.
Anyone who has seen the rotation schedule of US aircraft carriers knows that the condition of the aircraft carrier fleet is surprisingly poor. Ships are either delayed for years and unable to enter the dock for maintenance, or delayed for several years after entering the dock and unable to leave the port again.
Existing fleet has problems, and the new one is certainly not much better.US Navy's technological prowess is still worthy of awe, such as SPY-6 and Burke 3. But the world is material, and first they have to have ships. DDG-129 was finally launched recently, but its laydown time should be August 16, 2022, more than 950 days ago. LHA 8 Bougainville started construction in mid-2016, about a year earlier than the 003, but 003 will be commissioned this year, and Bougainville has not yet started its first sea trial since its launch. In addition to overcoming the problem of insufficient shipbuilding capabilities, the US Navy must also overcome the problem of radar and other armament production. It has been a year and a half since DDG-128 Burke 3 was launch, but it is still a long way from being commissioned, and even the integration of the SPY6 radar has not started. LHA 8's also still does not have a radar.
PLAN has not even faced a head-on confrontation, and the USN fleet is already shrinking. This is why I think China's decision-makers have no intention of unifying by force in the short term. They are using the atmosphere of the escalating situation to mobilize society, but it is the US military that is really anxious about balance of power and may trigger a war.