$2.8 Billion for two ships! Those are very expensive ships. Too expensive. However if the USN wants to go foward with this program they shall.
I wonder how many ships of this class will be built eventually. 8-12 is the likely number. My assumption each will be assigned to a CSG. (Carrier Strike Group)
I wonder how many ships of this class will be built eventually. 8-12 is the likely number. My assumption each will be assigned to a CSG. (Carrier Strike Group)