Turkey Military News, Reports, Data, etc.

sequ

Major
Registered Member
Kaan bulkheads being shown and milled:


And underside view:

View attachment 114396

KAAN's head engineer: "Maybe you'll see, we have a 6 meter long titanium frame that is done being processed. On this aircraft (referring to GTU-0/P0) we didn't have the necessary equipment to process such parts, so we procured them now. This will bring huge advantages regarding the production of the second prototype. The titanium frame is currently being processed, the operation is continuing. We are also making the necessary modifications to the main assembly jigs accordingly. You should be able to see the second prototype in the flesh next year around this time."

Thanks to @MADDOG for the translation.
 
Last edited:

Radonislav

Junior Member
Registered Member

KAAN's head engineer: "Maybe you'll see, we have a 6 meter long titanium frame that is done being processed. On this aircraft (referring to GTU-0/P0) we didn't have the necessary equipment to process such parts, so we procured them now. This will bring huge advantages regarding the production of the second prototype. The titanium frame is currently being processed, the operation is continuing. We are also making the necessary modifications to the main assembly jigs accordingly. You should be able to see the second prototype in the flesh next year around this time."

Thanks to @MADDOG for the translation.
6 meter long? Damn
 

Radonislav

Junior Member
Registered Member

sequ

Major
Registered Member
Akhisar OPV (ADA class based) almost ready for launch


public
public
 
Top