asif iqbal
Lieutenant General
6th Type 055 is coming along nicely
Those 2 modules should be welded together in the coming weeks
Those 2 modules should be welded together in the coming weeks
Rumours but from big shrimps
It says (1) Dalian Shipyard is building 002. 055 and 052D,
(2) JNCX (Shanghai) is building 003, 055 and 052D,
(3) HD (Shanghai) is building 075, 071, 052B, 052A and 056
(4) HP (Guangzhou) is building 054A, 054B and 056.
Rumours but from big shrimps
It says (1) Dalian Shipyard is building 002. 055 and 052D,
(2) JNCX (Shanghai) is building 003, 055 and 052D,
(3) HD (Shanghai) is building 075, 071, 052B, 052A and 056
(4) HP (Guangzhou) is building 054A, 054B and 056.
I think by 002 he meant the one without catapult (001A). 003 is 002. I don't think any of these designations are official, it's all assigned by observers which can get inconsistentIs that that they will build the type 003 or has construction began already?
If construction has began is the type 003 the same class as the type 002 or is it a CVN?