KJ-600 carrierborne AEWC thread

Intrepid

Major
The clearance height in the hangar is an essential planning element for the capacity of an aircraft carrier. Every centimeter counts!

This determines the top weight and the size of the overhangs for the flight deck.
 

Deino

Lieutenant General
Staff member
Super Moderator
Registered Member
... and there are rumours this one appeared with a new number 7xxxx including minor changes on the original black-headed radar and an air-speed sensor (?) added.

Some suggest it to be the second test aircraft.

(Image via @Oneninety from Weibo)

1619972230203.png
 

H2O

Junior Member
Registered Member
My opinion: it will be ready, when the carrier 003 is ready. Is it neccessary than to have a KJ-600 flying now? Or is enough time left and it could be the old tech demonstrator?

I'm not sure the posted photo is new. It could be an old photo that someone had kept for sometime and then decided recently to post it.

IMHO, I believe the PLA-N will aim to get as close to hitting the ground running as possible. They already have the facilities to test as much as possible of the airframe and procedures regarding launch and recovery. Assuming the systems are different from other similar aircrafts of the same role, it can easily be tested out in some office building.

I'm expecting a few available pre-IOC variants along with trained pilots and crew but, IOC status won't be achieved as it requires a working catapult-capable carrier. The sooner it's ready, the more knowledge they have on handling this aircraft. They can even start using it for live exercises (as opposed to computer simulations if available) with other aircrafts. The only thing they cannot fully test out is actual carrier deck handling operations.

The only reason I can think of in continuing to fly the old tech demonstrator is to test out the engines, the avionics and maybe develop a flight simulator (assuming negligible differences in flight characteristics). By looking at how the Chinese developed the J-15 and J-20, I doubt the Chinese would test out a new airframe and engines together.
 

Richard Santos

Captain
Registered Member
I think to be ready for actual service in 2-3 years, when 003 enters service, the new airframe will have to not only be flying, but also undergoing catapult launch test, arrested landing tests, experimental deck handling trials, now.

the Chinese have no shortage of experience building air worthy turboprops. So flying this thing is no big deal. What they have not had very much experience with is designing airframe structure stressed for carrier handling, folding wing mechanism, and aircraft equipment for carrier handling. If the airframe contains flaws that needs to rectified before service, it is unlikely to be with airworthiness, it will be much more likely stem from carrier handling requirementw.
 

Blitzo

Lieutenant General
Staff member
Super Moderator
Registered Member
My opinion: it will be ready, when the carrier 003 is ready. Is it neccessary than to have a KJ-600 flying now? Or is enough time left and it could be the old tech demonstrator?

The question was not about whether the KJ-600 is currently flying now or not -- that shouldn't really be a topic of debate, because we have pictures and rumours telling us that it has made its maiden flight already.

The question is whether that specific picture is showing KJ-600 or a demonstrator or not (like JZY-01, though tbh I'm still not sure if the JZY-01 was a flying demonstrator).
 
Top