MwRYum
Major
Re: PLAN's first Carrier Strike Fighter the J-15 Flying shark
That'd take at least one jet off the pack for the strike package, consider the capacity of the Varyag that's not a good news by all means.
Only alternative would be "real" aerial tankers to operate with the carrier group - so long the operation stay within the 1st Island Chain it'd be fine - and it shouldn't be a problem since China won't be going further than that for the time being. Yet there's another problem: would H-6U tanker capacity up to the job for heavy fighters like the J-15? If it can't refuel more than 3 fighters in a sortie it'd be unpractical and uneconomical.
With a buddy store capability for inflight fueling, the J-15 could take off with minimal fuel and a heavier weapons load and then fill up after takeoff. That's one way to help do more than air defense only off of the Varyag. Also, these aircraft will also be used for later carriers that could be CATOBAR.
That'd take at least one jet off the pack for the strike package, consider the capacity of the Varyag that's not a good news by all means.
Only alternative would be "real" aerial tankers to operate with the carrier group - so long the operation stay within the 1st Island Chain it'd be fine - and it shouldn't be a problem since China won't be going further than that for the time being. Yet there's another problem: would H-6U tanker capacity up to the job for heavy fighters like the J-15? If it can't refuel more than 3 fighters in a sortie it'd be unpractical and uneconomical.