HAL Tejas Jet Fighter

aksha

Captain
Please, Log in or Register to view URLs content!
·
Please, Log in or Register to view URLs content!

Please, Log in or Register to view URLs content!
LCA Tejas Division of HAL adds 6 gen-next equipment for machining ferrous and non-ferrous components.
4AFlrNY.jpg
 

Jeff Head

General
Registered Member
Aksha, I have asked in the past that you not repost these one liner, hash tag blurbs.

What we want on SD are actual articles about the aircraft that talk about these things. These generate good discussion and more information.

Not "Tweet" looking posts with only a few words.

There are so many of them sometimes that they flood the threads with such info and cause more weighty articles to scroll to other pages and then be missed by SD members.

Please follow this instruction.

Thanks.

DO NOT RESPOND TO THIS MODERATION
 

aksha

Captain
DRDO's Rail Track Rocket Sled (RTRS) Penta Rail Supersonic Track facility in Chandigarh.
SJfpzTU.jpg

bY79jAZ.jpg

The four kilometer long RTRS Penta track is crucial for testing of a wide range of critical systems such as payload for manned missions of ISRO, the navigation system for missiles and aircrafts, proximity fuses for advanced warheads, fuses for armament systems parachutes for payload delivery, arrester systems for aircraft such as LCA.
The facility consists of five rails, each having a length of 4 km, on which a test article can be propelled at supersonic speed with the help of specially designed rockets. The track built for this purpose is precision aligned and capable of withstanding high level of loads.
Please, Log in or Register to view URLs content!
 

aksha

Captain
Please, Log in or Register to view URLs content!


Mini Collapse of MMRCA deal has clearly shifted focus back to the development of Tejas MK-2 now. Defence minister Mahonhar Parrikar and Indian air force are closely monitoring the progress of Tejas MK-2 and have begun a monthly review of the project. Aeronautical Development Agency (ADA) which is developing Tejas MK-2 is feeling the heat but is confident that things will fall in place soon as a major review of the project will be undertaken soon with all concerned parties.

Tejas MK-2 will get final Technical freeze by the end of this year. project definition of Tejas MK-2 will be completed and the project will finally provide a road map to complete all the tasks to be executed over a fixed period of time before Aircraft is ready for Induction.

Avionics & Radar

idrw.org has learned from reliable sources that final Cockpit design layout for Tejas MK-2 has been frozen, MK-2 will sport Touch based two 6×8 main display with Smart MFDs and one 5×5 smart MFD which will have Day and Night mode .

Indigenously developed Uttam AESA radar for Tejas MK-2 has completed Software development for air-air sub-modes and have begun development of software which will allow air-to-ground modes which are crucial for aircraft to carry out high-resolution mapping, multiple grounds moving target detection and track, combat identification, electronic warfare, and ultra high bandwidth communications will be completed by year end and IAF and ADA along with LRDE will carry out Project Review at the same time .

Engines

ADA along with GE have carried out Computer assessment of the F414-GE-INS6 engine with 98 kN of thrust in Tejas MK-2 aircraft and have concluded that no major changes in Air intakes are required. GE too has confirmed that the development of F414-GE-INS6 engines is progressing well and will be on schedule and GE engineers will be in India Into carry out mating of the engine with the aircraft when first aircraft is ready.

No Prototypes

ADA will produce 3 Production aircraft which will be of Initial Operational Clearance (IOC) standards and Final Operational Clearance (FOC) will happen in next 3 years after the first flight of first Tejas MK-2 aircraft. they’re won’t be any prototypes and all aircrafts developed for the testing purpose will be identical to each other.

Astra BVRAAM Integration likely

India’s first Beyond-visual-range air-to-air missile (BVRAAM) Astra missile developed by the DRDO will be integrated with the first batch of Production variant of Tejas MK-2 to be delivered to the Indian air force. IAF is keen on getting Astra missile integrated with Tejas MK-I and MK-2 aircrafts. DRDO plans to start production of a missile by 2018-19.

First Flight

While IAF wants first flight of Tejas MK-2 to take place by end of 2017, ADA can only do it by end of 2018 but both are working together to speed up the process and might agree to some level of compromise, since ADA is not building any Prototypes, but an IOC Standard Production aircraft Integration of all crucial components along with weapons and radar will lead to longer build time said sources. Tejas MK-1 and Tejas MK-2 will share less than 30 % of the components with each other and all agencies are working on selecting component suppliers.

Second Production line

IAF and MOD are exploring feasibility of starting Second production line for Tejas MK2 while IAF is still not put a final figure on MK-2 aircrafts they want but it is estimated that final figure might be close to 300 aircrafts till then IAF is committed itself in procuring an initial 83 Tejas Mk 2s and the Indian Navy has expressed its firm requirement for 46 LCA Mk2 for Indian Navy. Talks have been held with Private Defence companies and Tata Advanced Systems Limited (TASL) is emerging as a viable option said source.
 

aksha

Captain
EJ-200TV on LCA pitch during Aero-India09
Extra control surface added due to Thrust Vectoring Nozzle.

it was quite surprising when GE won the engine race for the mk2

especially since the airforce itself was lobbying for a mk2 with EJ2000 thrust vectoring engine and apparently greater dry thrust than the GE414 (which is quite interesting in itself, particularly considering that they used to turn a blind eye to the LCA ,and let the designers create her based on the loose ASR given by the IAF ,and later moan about the plane).

this in itself shows how much IAF loves TVC,
asking it on both the FGFA as well as the AMCA

XGpkJiT.png

NTgrZPg.png
 
Last edited:

aksha

Captain
Please, Log in or Register to view URLs content!

FRzhCBu.jpg


The Comptroller and Auditor General of India (CAG), in its report for the year ending March 2014 has examined “Issues relating to Design, Development, Manufacture and Induction of Light Combat Aircraft (Air Force)”, the indigenous fighter now called the Tejas Mark I.

Media reports have dwelt mainly on CAG’s criticism of the LCA, such as the delays that led to the fighter --- cleared in 1983 and intended to enter service in 1994 --- eventually taking 30 years to obtain Initial Operational Clearance (IOC) in December 2013. The IOC is a landmark at which the fighter can be inducted into air force service. The CAG report says Final Operational Clearance (FOC) --- which clears a fighter for combat --- of the LCA is likely only by December 2015.

CAG’s criticism

The CAG says the LCA that has got initial operational clearance fell short of Air Staff Requirements (ASR) --- a key document that lays out the LCA’s essential capabilities. With many of these capabilities still lacking, the IAF could grant initial operational clearance only with 20 permanent waivers and 33 temporary concessions. These 33 shortcomings --- which include increased aircraft weight, inadequate speed, reduced internal fuel capacity and the absence of an electronic warfare suite --- are to be made good before final operational clearance is granted, or in the LCA Mark-II, expected by December 2018.

The CAG report nowhere recognises that, in fighter design anywhere, prototypes invariably go overweight while accommodating all the capabilities and weaponry that the users optimistically specify. Then, while paring down weight, some capabilities are diluted, in consultation with the user air force. In this, the LCA has trodden a well-worn path.

The CAG also finds the LCA’s claimed indigenization exaggerated. While the Aeronautical Development Agency (ADA), which oversees the LCA project, has estimated the LCA’s indigenous content to be 61 per cent (see graphic at bottom), the CAG says it "actually worked out to about 35 per cent" as of January 2015. In arriving at this percentage, the CAG does not differentiate between essential design-related and high technology aspects of the LCA and readily available products.

Criticising the slow pace of the LCA’s entry into service, the report notes that Hindustan Aeronautics Ltd’s (HAL’s) manufacturing facilities can build just four fighters annually against an envisaged requirement of eight fighters per year. The CAG overlooks the fact that the IAF has ordered only 20 LCAs with another 20 promised after the fighter obtains final operational clearance. Even so, HAL is enhancing production to 16 LCAs per year, a decision that a future CAG report might comment on unfavourably if more IAF orders are not forthcoming.

The media, focused on criticism of the LCA, has overlooked the report’s praise for having successfully developed a modern fighter aircraft. The CAG “appreciate(s) the efforts made by ADA and its work centres in the indigenous development of LCA which is comparable to many contemporary aircraft in the world…”

Getting it right

Essentially, the CAG report is an auditor’s review of a complex, high technology platform development, which involves risks and uncertainties that are not easily captured in a simple balance sheet assessment of targets and budgets. Any assessment of the LCA must start from the fundamental question: what was the objective of developing this fighter? All such programmes choose between two objectives: either utilising readily available technologies to build a fighter that could rapidly enter operational service

or pursuing a “technology leapfrog” in building a next-generation fighter, developing new technologies alongside the fighter itself. Obviously, this would take longer, since inevitable delays in the new technology areas would delay the project further.

India’s defence planners went fundamentally wrong in simultaneously attempting both things: building a fighter quickly to replace the retiring MiG-21s, while also attempting, as a “catch-up nation”, to leapfrog technology ambitiously.

From the outset, the LCA was based on fourth-generation (Gen-4) technologies. The first of these is its “unstable design”, which makes it more agile and manoeuvrable than “stable” aircraft that are designed to hold the path they are flying on. Unstable design requires an on-board digital flight control computer that continuously trims the flight controls. A systems failure would be catastrophic, so the flight control system has four levels (quadruplex) backup, a sophisticated design challenge.

Second, the LCA is constructed largely of composite materials that are lighter than conventional metal alloys. This results in a lighter fighter that can carry more fuel and weapons. Third, the LCA has “microprocessor-based utilities”, which means that computers control all the on-board systems like fuel, weapons, environment control, etc. Fourth, the LCA has an all-glass cockpit, in which conventional dials are replaced by intelligent multi-function displays, and the pilot can fly, aim and operate weapons through a helmet-mounted display.

“In our very first attempt, we went in for a frontline, state-of-the-art aircraft. It was complete technological audacity to decide, ‘We’ve never built a fighter before but we’ll start with a Gen-4 design’. Astonishingly, we’ve managed this feat, albeit with delays”, says an ADA official who works at the cutting edge of the LCA programme.

Confrontation, not cooperation

Given the conflict between a high-risk development path and the need to induct fighters quickly, the stage was set for confrontation between the users (IAF) and the developers (ADA, HAL, et al). A former ADA chief says, “The core challenge is managing technology risk. The users demand more and fast; but you don’t have the technology in your hand. This pits the IAF versus DRDO.”

Consequently, the LCA programme has seen more confrontation than cooperation between the IAF and ADA. The CAG notes that, as early as 1989, an LCA Review Committee had recommended the “Need for a Liaison Group between Air HQ and ADA to ensure closer interaction between the design team and the user”. Yet, “no such liaison group was formed and active user (Air HQ) participation in the LCA Programme started only after November 2006, which also impacted the LCA development.”

Even as the IAF criticised ADA, its demands for additional capabilities in the LCA kept delaying the operational clearances. The CAG report points out that in December 2009, the air force asked for the R-73E air-to-air missile to be integrated with the LCA’s radar and the pilots’ helmet mounted displays. The CAG also blames the air force for taking too long to identify a “beyond-visual-range (BVR) missile” for the LCA. Continuing IAF demands for modifications still prevent the LCA design from being frozen for production.

Unlike the IAF, the navy adopted the Naval LCA programme from the start, committing personnel and over Rs 900 crore from the navy budget. Says former naval chief and distinguished fighter pilot Admiral Arun Prakash, “The navy knows the importance of indigenisation, having experienced how foreign aircraft like the Sea Harrier fighter and Sea King helicopter were grounded for lack of support. Unlike the air force, we are not critically dependent upon the LCA, since we have the MiG-29K. But we will support it because it is an Indian fighter.”

The cost-overrun myth

Taking on from the CAG report, numerous media reports have suggested that the LCA’s development cost has ballooned 25-fold, from the initially sanctioned Rs 560 crore to the current budget of Rs 14,047 crore. Both figures are incorrect. This newspaper’s detailed analysis of the LCA budget (February 22, 2011, “When a sword arm is worth it”) quoted the ADA chief, PS Subramanyam, who clarified that Rs 560 crore was not the budget for the entire Tejas programme, but merely for “feasibility studies and project definition”, which also included creation of the infrastructure needed for the new fighter.

The infusion of funds for actual design, development and building of prototypes only began in 1993, with the funds allocated under the heading of “full scale engineering development”. (see graphic below)
JbYPZFe.jpg
 

aksha

Captain
Please, Log in or Register to view URLs content!


Equally misunderstood is the figure of Rs 14,047, which includes the cost of developing both the IAF and naval LCA, covering both the Mark I version as well as Mark II. As the graphic illustrates, the air force Tejas Mark I has so far cost Rs 7,490 crore, and is within its budget of Rs 7,965 crore.

Building capability, not just a fighter

For that amount, tiny compared to the billions that get sucked into developing fighters abroad, ADA says it has developed not just the LCA (and built 16-17 flying prototypes) but also an aerospace ecosystem --- DRDO laboratories, private industry, academic institutions, and test facilities like the
Please, Log in or Register to view URLs content!
(NFTC) --- that would allow India to build advanced fighters in the future.

Pushpinder Singh, noted aerospace expert and publisher of Vayu magazine, points out that the LCA has overcome all its major technology challenges. What remains, he says, is to tackle the final problems of converting it into a product --- issues like freezing specifications, evolving maintenance procedures and manuals, and the continuing challenge of establishing a fast-moving production line.

“Nothing prevents us from reconfiguring the technologies we have mastered through the LCA into indigenous fifth-generation aircraft like the Advanced Medium Combat Aircraft (AMCA) and the futuristic Unmanned Aerial Combat Vehicle (UCAV). The LCA has been an invaluable springboard and the AMCA will galvanise ‘Make in India’ more than anything done so far”, says Singh.

z9MJ9HM.png
 

aksha

Captain
Please, Log in or Register to view URLs content!


Separately, Parrikar stated clearly for the first time that the 36 Rafale fighters that Prime Minister Narendra Modi requested the French government for during his visit to Paris last month would not be followed by more Rafales. Instead, the money saved by curtailing the Rafale contract would be used to buy large numbers of the indigenous Tejas Light Combat Aircraft (LCA).

By buying 36 Rafale fighters at a price less than (what was quoted in response to) the earlier tender for 126 aircraft, I have saved the cost of 90 Rafales. We will use that money to buy Tejas LCAs”, said Parrikar.

This will address the concerns of aerospace experts, who had questioned the plan to buy 126 Rafales (six squadrons) to take the place of MiG-21 squadrons retiring from service this decade. It has been argued that the Rafale is too heavy, expensive and capable to replace a cheap, light, utility fighter like the MiG-21.

“The Rafale is not meant to replace the MiG-21”, said Parrikar, stating that he would instead buy large numbers of Tejas fighters, which he said would come cheap at a price of around Rs 150 crore each.

The Indian Air Force (IAF), which currently has 34 fighter squadrons against an assessed requirement of 42 squadrons, will lose during this decade another 7-9 squadrons of MiG-21s and MiG-27s that have already exceeded their service lives.

Yet, the IAF has ordered o just 20 Tejas fighters (one squadron) from Hindustan Aeronautics Ltd (HAL), with an additional order of 20 more promised after the fighter achieves final operational clearance, expected in early 2016.

Asked whether he was satisfied with the Tejas’ performance, the defence minister replied he was “satisfied to a certain level”. The IAF had accorded performance waivers while giving initial operational clearance to the Tejas, but Parrikar pointed out that none of the waivers affected flight safety.
 