CV-18 Fujian/003 CATOBAR carrier thread

Dante80

Junior Member
Registered Member
Can't avoid Indians getting all salty these days, I guess.

Either way, it'll be end of this year at the earliest to see they start to put together the flight deck...as long as it's not another ski-jump ramp that'd be worthy of a celebration.

I would be surprised personally if we caught a glimpse of the flight deck next year, given what we have seen so far from the project.
 

by78

General


One more from a slightly different angle.

50323342043_3816cd1e80_k.jpg
 

Anlsvrthng

Captain
Registered Member
No sign of machines, turbines, generators, pumps and all other heavy equipment that needs to be fitted to the bottom of the ship.
 

Tam

Brigadier
Registered Member
One more from a slightly different angle.

50323342043_3816cd1e80_k.jpg

The pointy bow ship at the center of the picture is well seen here. From the length of it along with the shape of the bow, it matches that of a 052DL. There are sets of modules being laid out in front of it that might be related to its construction, along with another set portside of that set.

Starboard of the carrier, there are modules that might for an LPG carrier. The 052DL getting its sonar fitted is also gone from the drydock. The sonar fitting might be the last thing that is fitted on the ship. As the number of destroyersi inside the fitting pool remains the same, the finished destroyer with the sonar fitted is going to be moored outside of the pool if its not gone into its sea trials.
 

Blitzo

Lieutenant General
Staff member
Super Moderator
Registered Member
Top