CV-18 Fujian/003 CATOBAR carrier thread

lcloo

Captain
No movement of super modules to dry dock until the dredging is completed. The original schedule on completion of dredging is around end of October, as indicated in the contract tender published around Feb/March this year.
 

Deino

Lieutenant General
Staff member
Super Moderator
Registered Member
Finally there seems to be some sort of movement at the Jiangnan Shipyard, it seems ar least as if the Type 003 carrier modules are being moved ...

(Images via @10969YUKIKAZE)


View attachment 54535 View attachment 54536


According to the original tweet and some translations it is assumed that the bow installation work of 003 type aircraft carrier has begun. ... however I can't see something what looks like a bow?!
 

KIENCHIN

Junior Member
Registered Member
According to the original tweet and some translations it is assumed that the bow installation work of 003 type aircraft carrier has begun. ... however I can't see something what looks like a bow?!
You’re not alone on this, neither can I. Totoro made the same comment on CDF.
 

Deino

Lieutenant General
Staff member
Super Moderator
Registered Member
You’re not alone on this, neither can I. Totoro made the same comment on CDF.


But at least that huge module under the hall close to the basin is either gone or moved again back under the further aft ones??? Or am I wrong?
 

Deino

Lieutenant General
Staff member
Super Moderator
Registered Member
No you’re not wrong, that has gone out of sight.


Me again, since I think I made a mistake ... at first sight I thought the two images posted yesterday were taken from the regular direction facing the big basin, however after comparing with the bigger image from top I was wrong and the line of sight - even if not entirely sure - seems to be as marked by that arrow ... Or am I wrong again.

Anyway, that still means of the so far two mega-blocks or super-modules at least one is missing?! Can anyone help me out?

PLN Type 003 carrier - 20190712 + 20191009+++.jpg
 

Deino

Lieutenant General
Staff member
Super Moderator
Registered Member
It seems indeed as I corrected myself, and this GE satellite image confirms that the large modules have been moved to the front edge of the basin - as we already discussed assuming that the assembly has reached the stage of being ready to be transferred to the dry dock for final assembly - and this image also confirms the rumours from yesterday, since the part looks indeed like the rumoured bow ....

PLN Type 003 carrier - 20190917 GE xs.jpg
 
Top