Someone is asking to be invited for tea.
From 2 weeks ago.
If this was 2 weeks ago, probably those parts have already been assembled. Perhabs already part of that module we saw in the recent aerial photos.
What are they doing ?
Wrong thread.
Someone is asking to be invited for tea.
From 2 weeks ago.
What are they doing ?
If this was 2 weeks ago, probably those parts have already been assembled. Perhabs already part of that module we saw in the recent aerial photos.
Wrong thread.
Don’t think they are trying to hide anything, it’s how the carrier is built, the lay out of the various compartment and other equipment, that they want hidden from prying eyes. Once in the dry dock, the fitting of the catapult just like in US carrier construction would be covered over.How long will it take before they can't hide it no more?
From Dafengcao blog. I guess this will be the test bed for nuclear power carrier
A bidding announcement of nuclear powered experimental ship platform was released yesterday by CGNPC to build a ship with dimensions of 152m(length)×30m(beam)×18m(moulded depth), draught 8.32m, displacement 30 000 tonnes, powered by 2×25MW PWRs.
In Wiki-article each A4W reactor of a Nimitz Class carrier has 550 MW.The maximum power of the Nimitz class, according to , is 190MW
From Dafengcao blog. I guess this will be the test bed for nuclear power carrier
A bidding announcement of nuclear powered experimental ship platform was released yesterday by CGNPC to build a ship with dimensions of 152m(length)×30m(beam)×18m(moulded depth), draught 8.32m, displacement 30 000 tonnes, powered by 2×25MW PWRs.