I think surely they have a dual carrier opps planed
Rumor time:
View attachment 47453
- Cracks in over 300 places were found merely 7 days after completion
- Water leaked into the engine and effectively disabled/fried it
- Cost (of repairs?) was over 7 billion dollars (I'm assuming RMB?)
- Lead engineer & manager are being investigated
Nevertheless, the original source is apparently a Hong Kong-based source and was allegedly talking about the Soviet aircraft carrier program, so take this new claim with a good helping of salt.
Rumor time:
- Cracks in over 300 places were found merely 7 days after completion
- Water leaked into the engine and effectively disabled/fried it
- Cost (of repairs?) was over 7 billion dollars (I'm assuming RMB?)
- Lead engineer & manager are being investigated
Nevertheless, the original source is apparently a Hong Kong-based source and was allegedly talking about the Soviet aircraft carrier program, so take this new claim with a good helping of salt.
There is still the trials at different load outs. It is safe to assume that the maiden trial of the Type 001A was conducted with an empty hangar with no aviation fuel or munitions stored. So future trials would have to be conducted with the ship carrying stimulated weights of standard and max loadouts.I think what the journalist menat is Hu Wenming said on June 19 not that the trial start in June 19
As to outlandish claim of succesfull test, I don't see why not ? Basically the main test of ship propulsion, leak test, structural integrity and ship major system of ballast sytem, control and handling, are completed with flying color
Of course the test is not complete yet but remaining test are mostly on the peripheral system of radar , electronic and system reliability, wire trap etc
That is the point, searching through the article relating to the Type 001A on The Paper, the latest one is dated on May. Which is way before the claimed 19 June date.I think what the journalist menat is Hu Wenming said on June 19 not that the trial start in June 19........
FYI, I found this ->That is the point, searching through the article relating to the Type 001A on The Paper, the latest one is dated on May. Which is way before the claimed 19 June date.
So these websites are obviously not caring enough to do some proper research.