Climate Change and Renewable Energy News and Discussion

tphuang

Lieutenant General
Staff member
Super Moderator
VIP Professional
Registered Member
Sany has produced 2 ton class green hydrogen production & refueling integrated station.

Please, Log in or Register to view URLs content!

Can produce 2t of green hydrogen per day and storage another 1000kg. In total, can supply/refuel 4 FCEVs at the same time and serve over 100 per day.

If we use 75kg H2 fuel tanks on FCEVs, then each of these stations could refuel 40 HDTs per day, which is quite good. Of course if we use the large newly developed liquid fuel tanks, we could store and refuel even more
 

tphuang

Lieutenant General
Staff member
Super Moderator
VIP Professional
Registered Member
Please, Log in or Register to view URLs content!

methanol ships. They put a methanol bunkering ship into service here in Yangshan and then successfully refueled it there. This really test out the entire usage and refueling of methanol ships. There are more than 200 methanol ships on order and this port stores 280k m3 of methanol for refueling.
 

tphuang

Lieutenant General
Staff member
Super Moderator
VIP Professional
Registered Member
Please, Log in or Register to view URLs content!

very interesting here. Again, ACWA Power is teaming up with Longi in this major Uzbek green ammonia project. Longi will supply the alkaline electrolysis system. Phase 2 anticipates eventually output of 500k ton of green ammonia per year via 2.4GW wind power
 

vincent

Grumpy Old Man
Staff member
Moderator - World Affairs
We are now seeing hydrogen train getting tested after successful conversion by crrc. Significant to see tech that could allow conversion of diesel to hydrogen train

Please, Log in or Register to view URLs content!
My understanding is "diesel" trains use the diesel engines to generate electricity which drive electric motors in the locomatives. Probably shouldn't be difficult to replace the diesel generator with a fuel cell system.
 

pbd456

Junior Member
Registered Member
Please, Log in or Register to view URLs content!

talking about PetroChina with it's first major green hydrogen project. Has produced for 8 months so far. Max production just 2100t per year.

But everyone kind of have to just figure out how to do small project before moving to large project
Is this considered as a big project?
 
Top