China gas turbine industry is maturing For a long time the development of Gas turbine is hampered by low industrial base like casting and lack of large Industrial Gas Turbine manufacturing But this are changing fast
As I said before the first stage blade of Gas Turbine is the hardest to manufacture Since they experience the most severe temperature and thermal shock. The technology are the same whether it is industrial or military application. It is still experimental and not production model yet
Today China successfully casting the first stage 300 MW GAs turbine Her is the story translated from Google. It is a huge step But the like of Siemens, ABB, GE, Rolls, Mitsubishi have a long lead that is why they can make military GT faster. And the author is wrong civilian GT can be converted to military application with no problem witness the GE LM series
Where does China's autonomous 300 MW class heavy-duty gas turbine technology come from?
Foreign and Military Observer, Independent Commentator
2018-12-26 11:04:23Font Size:A-AA+Source: Observer Network
Keywords:gas engine wheelChina independent heavy-duty gas turbine heavy gas engine wheel
[Text / Observer Network columnist Shi Yang]
According to the "Technology Daily" reported on December 26, China's first self-contained 300 MW class F heavy-duty gas turbine turbine first-stage stator blade casting, successfully passed the appraisal on the 25th. This progress is called the first important breakthrough in China's core components of heavy-duty gas turbines, and it is also the most important milestone achievement of the national science and technology major project "Aero Engines and Gas Turbines".
To understand the significance of the so-called "heavy-duty gas turbine turbine first-stage vane castings", it is necessary to understand the position of this product on the gas turbine. The common gas turbine in the contemporary structure is similar to the turbofan engine of the aircraft in its overall structure. The core machine part composed of the compressor, the combustion chamber and the turbine is the key equipment among them, and the hot end part in which the hot gas flow is located. Such as flame tubes, gas turbines, guides and nozzles are the key to their key.
The part of the red gas on the right side of the combustion chamber requires the hot end part
Among them, the main function of the gas turbine is to convert the energy of the high-temperature and high-pressure gas in the combustion chamber into mechanical work, and some of them drive the compressed air of the cold-end compressor to keep the gas turbine running continuously, and the rest is used as the output power of the gas turbine. , to drive generators or other equipment.
The “Gas Turbine Turbine Stage 1 Static Blade” manufactured this time is part of the gas turbine component and the first gas turbine to contact the high temperature and high pressure gas stream. The important role of the vane in this is to further expand and expand the gas stream, while reducing the pressure and temperature of the gas, so as to better rotate the blades or rotors in the turbine to produce a power output.
Since the first stage vane of the gas turbine turbine is the first to contact the high temperature gas in the work and is always surrounded by the gas, the working conditions are extremely bad, and the gas turbine starts faster, and in the short time during startup and shutdown. To achieve rapid temperature rise and temperature reduction, the thermal shock is also the most serious, so the first stage vane is designed to have sufficient strength and rigidity, but also to withstand high temperature, heat corrosion, thermal shock, and Can't have too much thermal stress.
The blades that are generally seen are mostly rotors, staggered with the stationary blades.
Due to the technical difficulty and high processing requirements, China's research in the field of gas turbines has not accumulated enough for a long time. It can only imitate products with relatively simple structures abroad, or use aviation engines produced by the aviation industry to be converted into gas turbines. These products generally suffer from poor performance and low power. At the end of the last century, the domestic gas turbine generator system was stagnant because of the severe shortage of oil and gas supply and the energy policy of “refueling with coal”. Until the beginning of the 21st century, China has really launched large-scale technology introduction and independent research and development of heavy gas turbines in the gas turbine field.
According to the combustion chamber temperature, these heavy-duty gas turbines can be divided into E-class, F-class and H-class. The technical difficulty and advanced level are also upgraded step by step. Before the large-scale development of F-class heavy-duty gas turbines in China, China started in 2001. The design and development project consortium consisted of AVIC, Tsinghua University, Institute of Engineering Thermophysics of the Chinese Academy of Sciences, Shanghai Jiaotong University and other units. The R0110 heavy-duty E-class gas turbine was jointly developed and successfully passed the expert group on March 21, 2014. acceptance. On this basis, a number of domestic research institutes have carried out the construction of experimental facilities and self-developed work of F-class heavy-duty gas turbines.
Previously developed R0110 heavy-duty E-class gas turbine in China
Among them, one project is closely related to the development of China Power Investment China's re-ignited 300MW class F-class heavy-duty gas turbine, that is, Beijing Huaqing Gas Turbine Co., Ltd. (formerly known as the Gas Turbine and Coal Gasification Jointly approved by the National Development and Reform Commission in 2008). CGT-60F 70MW gas turbine developed by the National Engineering Research Center of the Cycling. Because this engine did not meet the power of 70MW from the beginning, it was developed as a technical verification machine for the domestic F-class 300MW heavy-duty gas turbine.