I don't think we have anywhere near the kind of information to make that kind of call yet, given "never" is a long, long time.
There is also a difference between various systems not proliferating to all units by design, due to deliberate the cyclical nature of force structure modernization (e.g. not every fighter brigade, even once transitioned to 5th gens, will be equipped with J-20s because other fighter aircraft of that generation or beyond will cycle through the orbat), versus going for a deliberate high-low mix (e.g. procuring a mixture of ZTZ99 and ZTZ96 family tanks at the same time, in large scale).
And the other option that other people have raised, of HJ-11 being merely a limited scale procurement in a vein of ZTZ98, is also very much there as well.
In the case of HJ-11, we do not know which of those options is true, and I don't think there's any basis to push strongly for any of those claims just yet.