China's Space Program Thread II

by78

General
I think these are protective panels against space debris. The next spacewalk is imminent, and additional protective panels will be installed.

54400043494_228d77ad31_k.jpg
54400233465_768655c54c_k.jpg
 

by78

General
More information on Astronstone's AS-1 launch vehicle has been released by the company:
– Diameter: 4.2m
– Capacity (non-reusable, reusable): >15 tons (to LEO?), >10 tons (to LEO?)
– Launch cost (non-reusable, reusable): 20000RMB or 2800USD per kg, 10000RMB or 1400USD per kg.
– Turnaround cycle for the reusable 1st stage: 10 days.

According to AstronStone, the development of the AS-1 is progressing rapidly. The 2nd stage propellant tank will be finished this month. By the end of this year, the company expects to begin conducting 2nd-stage ignition tests, finish building the 1st stage for the maiden flight, as well as completing ground verification tests of the chopstick recovery system.

Sounds ambitious. We'll see.

54363596092_27f0aa11c6_o.jpg

54364694538_0d7c443c8e_o.jpg

A thin-wall stainless steel propellant tank for the 2nd stage of the AS-1 launch vehicle has rolled off the production line. The tank has a diameter of 4.2m.

54401985634_583029e93d_o.jpg

54401814966_f3eb7c1b93_o.jpg
 