Miragedriver
Brigadier
Brazil Sao Paulo modernize its aircraft carriers for serving until 2039
( defensa.com ) The Brazil Navy has decided to start a process of modernization of its aircraft carrier NAe (Navio Aerodrome ) Sao Paulo (A12 ) to start in June 2015 and will last four years. The process, called " Period Modernização Meio " or PMM , allow the carrier to return to active duty in 2019 and that may be available twenty years, until 2039 .
A number of amendments are intended to allow the operation of an aircraft over 20 tonnes , predictably the Sea Gripen . Why are amended and replaced parts of the two elevators to move aircraft over 20 tonnes and repair and amend the two catapults. In this sense the November 24 contract assigned to the French shipyard DCNS for the maintenance and modernization of the propulsion system , valued at $ 2.1 million was published.
In the area of weapons systems, new air defense systems will be installed point , as the approach radars are replaced , the new tactical combat system ( SICONTA ) Mk IV and an integrated communications system will be installed . Inside the living conditions for the crew will be improved, proceed to the replacement of pipes and conduits , will work on the installation of a propulsion system , power generation and distribution and reviewing generation systems will be performed steam. The optical system of landing, the flight deck and hangar was also modernized , modified and modernized systems, water treatment, air conditioning, cold storage and compressed air .
The " Sao Paulo " was originally a French aircraft carrier, the FNS Foch, decommissioned in France 2000. This modernization allowed for now to further the project of construction of a new aircraft carrier more than 50,000 tons displacement to be built in Brazil with the assistance of a foreign technologist would bring the basic design.
I will now get back to bottling my Malbec
( defensa.com ) The Brazil Navy has decided to start a process of modernization of its aircraft carrier NAe (Navio Aerodrome ) Sao Paulo (A12 ) to start in June 2015 and will last four years. The process, called " Period Modernização Meio " or PMM , allow the carrier to return to active duty in 2019 and that may be available twenty years, until 2039 .
A number of amendments are intended to allow the operation of an aircraft over 20 tonnes , predictably the Sea Gripen . Why are amended and replaced parts of the two elevators to move aircraft over 20 tonnes and repair and amend the two catapults. In this sense the November 24 contract assigned to the French shipyard DCNS for the maintenance and modernization of the propulsion system , valued at $ 2.1 million was published.
In the area of weapons systems, new air defense systems will be installed point , as the approach radars are replaced , the new tactical combat system ( SICONTA ) Mk IV and an integrated communications system will be installed . Inside the living conditions for the crew will be improved, proceed to the replacement of pipes and conduits , will work on the installation of a propulsion system , power generation and distribution and reviewing generation systems will be performed steam. The optical system of landing, the flight deck and hangar was also modernized , modified and modernized systems, water treatment, air conditioning, cold storage and compressed air .
The " Sao Paulo " was originally a French aircraft carrier, the FNS Foch, decommissioned in France 2000. This modernization allowed for now to further the project of construction of a new aircraft carrier more than 50,000 tons displacement to be built in Brazil with the assistance of a foreign technologist would bring the basic design.
I will now get back to bottling my Malbec