Why is this important? Because sortie generation is one of, if not the most important metric for naval aviation capabilities, and seems to be one of the first aspects of carrier aviation ignored by critics of big deck nuclear aircraft carriers. For example, take the idea of a CVL, a 30,000 ton light carrier alternative supporting 20 F-35Bs. Let us be super optimistic, and suggest the F-35B is as reliable as the F/A-18C from a maintenance perspective (maybe a very patient aviator can explain to the peanut gallery why this is a super optimistic suggestion). In Surge 97, the F/A-18C achieved the eye popping sortie rate of 4.5 sorties per day, but N88 planning factors for the F/A-18C is 2.0 sorties per day. For the purposes of this exercise, let us assume the F-35B can support 2.0 sorties per day on a CVL.
If we assume 20%(closer to 40%) of the aircraft are not mission capable, and we should because that is how Murphy’s Law works on an aircraft carrier, we now have a CVL supporting 16 F-35Bs capable of conducting 32 sorties per day at a 2.0 sortie rate, and doing so without the services of carrier based E-2D or EA-18G. If a Nimitz class can support 120 sorties per day, we would need 4 CVLs to match the number of sorties a single CVN can support, and a CVN comes with E-2Ds and EA-18Gs built in. The Ford class, which is not only less expensive to operate than a Nimitz, but is specifically designed to support higher sortie generation rates, is probably going to average $8.5 billion over its lifetime (I am guessing, but using CBO numbers to guess). That means the Navy would have to build 30,000 ton CVLs at a cost under $2.2 billion each, which would be at a cost less than the 9,800 ton DDG-51 destroyer in the FY2010 budget, in order to be less expensive and equally capable in sortie generation as a Ford class.
I hate to break it to the CVL / Small Carrier crowd, but it is 100% MYTH and FUD when it is claimed that big deck nuclear aircraft carriers are somehow inferior to alternatives, including on the cost metric. They are in fact, superior in every costing, capacity, and capability metric one can find. The only consideration where CVLs have a good argument is in terms of risk, because CVNs put a lot of eggs in one basket. It all comes down to the level of risk that is acceptable vs the level of cost, capacity, and capability desired for your naval force. I’ll take the big deck, at least 10 if possible, with its associated conventional launch capability and with the E-2D and EA-18G, I’ll whip any 4 VSTOL CVLs every single day of the century.
—