Didn't the 054A get cut in half for 054Bs? Or something like that?We are currently seeing rapid construction of 054 and 052, perhaps this is to compensate for the 055 batch 2 cancellation?
Also do we kno whow many 052DLs are planned?
Didn't the 054A get cut in half for 054Bs? Or something like that?We are currently seeing rapid construction of 054 and 052, perhaps this is to compensate for the 055 batch 2 cancellation?
No idea about 054B, but 054A and 052D classes could well be built for export for many years.Didn't the 054A get cut in half for 054Bs? Or something like that?
Also do we kno whow many 052DLs are planned?
I think we should just wait, basically still rumours that could turn out to be true (or false).I believe we may have been bamboozled.
Yea that seems more likely.I think we should look at the root of this "CGX" rumour.
From the original poster:-
1. There is no mention of "CGX" in the original post, rather it was 改进型055 which means upgraded variant of type 055.
2. Orginal poster also wrote that second batch of "current variant of type 055 (i.e. same spec as first batch of 8) is suspected will be postponed temporarily. And this postponment is due to building of a more powerful new ship. IMO a more powerful new ship need not be a totally new design but an upgraded type 055 with significant modifications, with features claimed to be better than flight 3 of AB DDGs.
I also expect the extend of upgrade for new variant of type 055 wil be similar to changes from type 054 to type 054A.
View attachment 91631
Share with us pics of the assembled products and how long you took to assemble themIt's gonna be a good weekend, when you arrive home and PLA MRE, DF-16 and two PLAN heavy hitters are just waiting there...
View attachment 89115View attachment 89116
View attachment 89117
View attachment 89118View attachment 89119View attachment 89120
Share with us pics of the assembled products and how long you took to assemble them
Or it could be possible they actually went for 055As, but are now stopping and adding upgrades that they might have planned for a say '055B'