wait a minute just wait a minute
I see ONLY 7 x Type 726 LCAC in the shipyard, as opposed to 10, where are the other 3?????
could it be that those 3 are actually out doing operations or have they been moved to the bottom left side of the photo on dry dock where they usually sit out of sight ??
OR could they be testing a full load on them?? finally AFTER 36 months ?