I guess all 3 Type 054A vessels will be launched at the same time; and then others Type 054A segments (now placed besides the dry dock) will be placed into the dry dock.
I guess all 3 Type 054A vessels will be launched at the same time; and then others Type 054A segments (now placed besides the dry dock) will be placed into the dry dock.
Two 054AG FFGs and one 054-mod cutter fitting out at the basin after their launch two weeks ago. Posted by @sugar_wsnbn on Twitter.
View attachment 134904
According to the old graphic that area is a module assembly/storage space. The drydock shaped structure should be another construction hall. Sorry for low res, but its the best I could find at short notice. If someone has an image of the yard model at hand, that would be great too.Just an late add-on:
Given the presence of an overhead crane to the top left of the photo and a drydock-shaped sink that lays directly underneath that overhead crane's path + connected to the fitting out basin, is it possible to expect a new, much smaller drydock in that location?
That sink (if it is a drydock) could theoretically construct ~1 DDG/CG-sized, 2 FFG-sized or 3 FFL-sized ships at any given time (guess-timated dimension according to Google Maps is ~300 meters x ~45 meters).
Sure that's a smaller dry dock at the upper left corner of the photo. FYI, the dry dock entry gate was launched on the same day with the three Type 054A/cutter vessels.Just an late add-on:
Given the presence of an overhead crane to the top left of the photo and a drydock-shaped sink that lays directly underneath that overhead crane's path + connected to the fitting out basin, is it possible to expect a new, much smaller drydock in that location?
That sink (if it is a drydock) could theoretically construct ~1 DDG/CG-sized, 2 FFG-sized or 3 FFL-sized ships at any given time (guess-timated dimension according to Google Maps is ~300 meters x ~45 meters).