China's Space Program Thread II

sangye

New Member
Registered Member
YF-100K development continues apace. The engine has conducted its first hot test run of 2025.

54322259687_190d0310a6_h.jpg
54323382374_40aa8732a3_h.jpg
What would be the reason for testing an already in production engine? Have they done any modifications to it?
 

by78

General
More detailed information on the manned lunar rover project. After two rounds of expert assessment of various submitted proposals, two designs have been chosen for prototype development. One is being developed by Shanghai Academy of Spaceflight Technology (SAST) and the other by a subsidiary of CASC. The two prototypes will be pitted again each other, and the winner will be sent to the moon. China Manned Space Agency is now soliciting the public for names for the manned rover.

54103241971_d574a3cceb_o.jpg
54103241956_8993fc4b50_o.jpg

According to Mr. Zhang Chongfeng of CASC, the proof-of-concept/demonstrator manned lunar vehicle being developed by CASC has finished testing at lunar surface simulation field. The project is now moving onto initial prototyping stage.

54324152792_0dedc157f9_h.jpg
 

by78

General
At the Beijing Commercial Aerospace Development Conference, eight advanced research laboratories were officially announced, and all will be headquartered in Beijing:
– Laboratory for reusable space launch vehicle design
– Laboratory for engineering mechanics and flight control of reusable launch vehicles
– Laboratory for integration and application of reusable LOX/Methane launch vehicles
– Laboratory for (space-based) space environmental detection and monitoring
– Laboratory for high-efficiency space propulsion systems
– Laboratory for rotating detonation engine (RDE) and applications
– Laboratory for satellite internet applications
– Laboratory for inter-satellite communication and control

54325462625_34c6791a9f_o.jpg
54324155617_a76928058a_o.jpg
 
Top