The Build - Placing equipment and aircraft on the flight deck and elevators, completing the model - March 10, 2015
Well, all that was left at this point was to glue down the island, and then place the equipment (cranes, fork lifts, tugs, etc.) and the aircraft on the flight deck and elevators.
I ended up placing the aircraft in a little different configuration than what I used earlier in my dry fit. Mainly, I decided to place the Sea Knights forward of the island, with most of the Super Stallions aft of the island.
Once that was done and dried well, it was time to simply take the finishing pictures.
Here are the main pics:
Well, all that was left at this point was to glue down the island, and then place the equipment (cranes, fork lifts, tugs, etc.) and the aircraft on the flight deck and elevators.
I ended up placing the aircraft in a little different configuration than what I used earlier in my dry fit. Mainly, I decided to place the Sea Knights forward of the island, with most of the Super Stallions aft of the island.
Once that was done and dried well, it was time to simply take the finishing pictures.
Here are the main pics: