TF35000 subsystems test center and Quantum research laboratory opened at Gebze Technical University
View attachment 176848
"Critical Test Infrastructure for TRMOTOR
Emphasizing that the TRMOTOR Subsystems Test Center will play a critical role in domestic engine projects, Mantar stated that thanks to the infrastructure developed at the center, engines will undergo performance and durability tests under real operating conditions.
Mantar said, "Just as designing an engine is critical, verifying its most challenging systems with domestic resources and conducting the qualification processes on our own soil is equally vital.""
First pic of Murad 600-A:
View attachment 167857
CEO of Aselsan: "This is the front radar of Kaan"
Eyeballing that thing gives me 95 cm diameter with IMO 2300 TRM. @30W per TRM should give it a tracking range of ~191km vs 1m2, in line with TUSAS CEO statement of 180-200km. Used with AESARadarCalculator by @Stealthflanker
View attachment 167858View attachment 167859

BTW, I don't believe the TRMs are installed, it's just the antenna backplate and slots where the TRMs need to be installed in.
Congress got 2 weeks to block the F110 sale to Turkiye, but for that they need a 2/3 majority. The chance of that happening is very small.So they are not joking at all and are serious about the TF110 (Güchan)
All critical components of the engine are produced with domestic resources. We have produced a total of 6 of these engines to date. We plan to carry out the testing and calibration processes of the engines from November 2026 onwards. Our main goal here is to reduce dependence on foreign countries in critical technologies, to improve our own engineering capabilities, to lead our defense industry companies by creating a sustainable national infrastructure.
- MoD, Yasar Güler