What is there to help when it’s never lifted a load in and out of a LPD well deck?
Maybe the fact that it hadn't itself.
What is there to help when it’s never lifted a load in and out of a LPD well deck?
This is nothing but a matter of time. What I would actually like to see is 2 columns of HMMWVs loaded simultaneously. Scratch that. What I would actually like to see is a new 726B variant that has the same carrying capacity as the LCAC.Lets see a loaded LCAC entering and leaving a well deck then talk
Until then Type 726 is a white elephant
That's solely dependent on the ability to up-rate the QC-70.This is nothing but a matter of time. What I would actually like to see is 2 columns of HMMWVs loaded simultaneously. Scratch that. What I would actually like to see is a new 726B variant that has the same carrying capacity as the LCAC.
Sores of units