There are 3 possibilities:
1. J-31 is severely deficient in some way, and the deficiency can not be rectified in any economic or timely manner. There is no evidence it is not severely deficient, so this possibility can't be excluded.
2. j-31 is not technical deficient per se, and PLAAF has a requirement for a lower end stealth fighter, but also already has a different low end stealth fighter project in progress that is superior to j-31, and see no need to fund a bridge design that complicates logistics.
2. J-31 is adaquate, but PLAAF has no requirement for a low end stealth fighter. PLAAF may not envision a numerically very large stealthy force composition that would require a hi-lo mix. It may see a numerically leaner force of all J-20s as its main stealth inventory
1. J-31 is severely deficient in some way, and the deficiency can not be rectified in any economic or timely manner. There is no evidence it is not severely deficient, so this possibility can't be excluded.
2. j-31 is not technical deficient per se, and PLAAF has a requirement for a lower end stealth fighter, but also already has a different low end stealth fighter project in progress that is superior to j-31, and see no need to fund a bridge design that complicates logistics.
2. J-31 is adaquate, but PLAAF has no requirement for a low end stealth fighter. PLAAF may not envision a numerically very large stealthy force composition that would require a hi-lo mix. It may see a numerically leaner force of all J-20s as its main stealth inventory